Similar Projects
Construction of the South Main Street Low Pressure Sewer Construction Project
Infrastructure
Bidding
$200,000 est. value
Marlborough, CT 06447

Trench Restoration 2021
Post-Bid
Southington, CT

Storm Drainage Repair
Infrastructure
Post-Bid
$440,000 to $530,000 est. value
East Hartford, CT

Springside Avenue Drainage Outfall Replacement
Results
East Hartford, CT 06108

Bartholomew Avenue Parkville TOD Stormwater Infrastructure and Streetscape Project
Results
Hartford, CT

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Pequabuck River Conduit - Culvert Rehabilitation
Results
Bristol, CT 06010

Drainage Improvements - 2021 Mill and Pave Project
Infrastructure
Post-Bid
Suffield, CT

Flood Control System Main Street Levee Closure Structure Repairs
Results
Hartford, CT

Pipesafe Protection Sewer Repair
Term Contract, Infrastructure
Post-Bid

2021 Storm Drainage Installation and Repair
Term Contract
Results
West Hartford, CT

Stormwater Monitoring Services
Term Contract
Post-Bid
Hartford, CT

Roadway Reconstruction/ Storm Drainage and Miscellaneous Work at Various Locations
Results
Bristol, CT

Detention Pond Inspection and Cleaning
Infrastructure
Post-Bid
Southington, CT

Retaining Wall Replacement at Memorial Boulevard
Infrastructure
Results
Bristol, CT

Last Updated 04/20/2022 09:42 AM
Project Title

Drainage Repairs - Phase 1 - BDL

Physical Address View project details and contacts
City, State (County) Windsor Locks, CT   (Hartford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency - 03/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the rehabilitation of the interior walls of approximately 19 drainage structures, field verification and investigation of 3 drainage structure top sections, and rehabilitation of one sub-surface stormwater pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents