Similar Projects
O'Reilly Auto Parts (BD1)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Brandon, FL

Altura Bayshore - Phase II
New Construction - 184,000 SF
Design
$2,660,000 est. value
Tampa, FL 33629

Altura Bayshore - Phase II
New Construction - 184,000 SF
Design
$2,660,000 est. value
Tampa, FL 33629

Checkers at Madison Square
New Construction - 954 SF
Post-Bid
Less than $500,000 CJ est. value
Tampa, FL 33619

Baytown Apartments
New Construction - 38,766 SF
Post-Bid
Tampa, FL 33646

Rome Yard Mixed Use Development
Results
Tampa, FL 33602

Rome Yard Mixed Use Development
Results
Tampa, FL 33602

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Construction
$500,000,000 CJ est. value
Tampa, FL 33605

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Construction
$500,000,000 CJ est. value
Tampa, FL 33605

Gandy Boulevard Apartments
New Construction
Pending Verification
Tampa, FL 33611

Thompson Hotel - Hyatt
New Construction - 111,000 SF
Pending Verification
Tampa, FL 33602

West Shore Office Buildings
New Construction, Demolition - 540,000 SF
Design
Tampa, FL 33609

Reign Living Student Apartments
New Construction - 385,025 SF
Post-Bid
Tampa, FL

Development of City Owned Property
New Construction
Results
Plant City, FL 33563

Holiday Inn Express
New Construction - 61,658 SF
Construction
$5,000,000 est. value
Tampa, FL 33607

Last Updated 04/25/2023 03:47 PM
Project Title

East Harrison Street Mixed Use Development

Physical Address View project details and contacts
City, State (County) Tampa, FL 33602   (Hillsborough County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Food/Beverage Service, Hotel/Motel, Office, Parking Garage, Paving/Reconstruction, Retail, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Schematic Drawings, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a 28 story apartment building with 45,000-square-feet of amenities and ground floor retail space and a hotel building. Scope details have not been released. As of April 25, 2023, this project is in the schematic design phase. Information regarding the general contractor and method of selection has not been disclosed. Construction is expected to start in fourth quarter 2023.

Details

28 Stories Above Grade, New Construction, New Construction. 6 Stories Above Grade, New Construction, New Construction. 1 Story Above Grade, 32,500 SF. Parking Spaces, 586 Parking Spaces. 1 Story Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents