Similar Projects
Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Home 2 Suites / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

A New Strength and Conditioning Facility
New Construction, Infrastructure - 3,750 SF
Bidding
$900,000 CJ est. value
Montgomery, AL 36117

Tidal Wave Car Wash - Atlanta Hwy / Montgomery
New Construction, Infrastructure - 3,120 SF
Bidding
$400,000 CJ est. value
Montgomery, AL 36117

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Lateral Replacement Project
Infrastructure
Results
$739,000 est. value
Montgomery, AL

NE Parking Lot Garrett Coliseum Sealcoating and Pavement Striping
Infrastructure
Results
$40,800 est. value
Montgomery, AL 36107

New Recreation Center - City of Montgomery
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Montgomery, AL 36104

Motley Drive Townhouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montgomery, AL 36110

Beverage Park - Manna Capital Partners Manufacturing Facility
New Construction, Infrastructure - 1,700,000 SF
Conception
$600,000,000 CJ est. value
Montgomery, AL 36104

Squadron Operations Building Addition and Alteration
Addition, Demolition, Renovation, Infrastructure - 4,603 SF
Design
$5,000,000 CJ est. value
Montgomery, AL 36108

RFQ Contractor - Renovation of Building 1407
Infrastructure, Renovation
Bidding
$5,000,000 CJ est. value
Montgomery, AL 36108

Last Updated 01/20/2023 09:53 AM
Project Title

Roadway Construction

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36104   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,787,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

City of Montgomery County, Alabama New Roadway Construction, Widening, and Additional Turn Lanes on Westco Place, Wasden Road, and Folmar Parkway to Benefit Fedex Packaging Systems Distribution Facility The City of Montgomery adopted Resolution 63-2021 which describes an administrative plan for a 30% minimum participation goal for disadvantaged, minority and women owned business enterprises for public works projects The Bracket Estimate on This Project is From $1,430,000 to $1,787,000. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Project's Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. The Principal Items of Work Are Approximately as Follows: 3,0630 Sy Geosynthetic Reinforcement for Soft Soil Stabilization; 14,125 Tons Crushed Aggregate, Section 825, for Miscellaneous Use; 4,263 Tons of Asphalt Paving; 2,372 Lf of Curb and Curb & Gutter; Drainage Items; Utility Adjustment Itesm; Irrigation System; and Other Miscellaneous Items for General Roadway Construction Including Erosion Control and Traffic Control Items. The Entire Project Shall Be Completed in Sixty (60) Working Days. Proposals Will Be Issued Only to and Accepted From Contractors on the Alabama Department of Transportaion's (ALDOT) List of Pre-qualified Contractors. The Award of the Contract Will Be Made Only to a Contractor Who Has a Valid Certification of Qualification From ALDOT as Required by State Law and Will Not Be Made to Any Bidder Who is Considered by ALDOT to Be Disqualified From Bidding, or is an Affiliate of or Has a Corporate Officer, Director, or Principal Owner Who is a Corporate Officer, Director, or Owner of, Another Person Who is Presently Disqualified by ALDOT, Further Details and Definitions Regarding This Provision Are Included in Section 102 of Special Provision 18-lpa2 and ALDOT's Standard Specifications. Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifications Will Be Required of the Contractor, and Any and All Subcontractors, Prior to Beginning Work. The Contractor Will Be Required to Perform Work Amounting to at Least 30% of the Total Contract Cost With His Own Organization. This is a State-funded Project Through ALDOT. The Proposed Work Shall Be Performed in Conformity With All Applicable Laws, Rules, and Regulations. The City of Montgomery is Required to Comply With the Beason-hammon Alabama Taxpayer and Citizen Protection Act, 31-13-1 Et Seq. Of Code of Alabama 1975 (Act No. 2011-535), Subsequently All Bidders Are Required to Submit an E-verify Affidavit Stating They Are Enrolled in the E-verify Program and the Entire Associated Memorandum of Understanding on the Outside of Their Sealed Bid Proposals. Montgomery is Required to Comply With the Beason-hammon Alabama Taxpayer and Citizen Protection Act, 31-13-1 Et Seq. Of Code of Alabama 1975 (Act No. 2011-535), Subsequently All Bidders Are Required to Submit an E-verify Affidavit Stating They Are Enrolled in the E-verify Program and the Entire Associated Memorandum of Understanding on the Outside of Their Sealed Bid Proposals. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents