Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

45th Street Watermain Extension - W-036 - City of Elmo
Infrastructure
Conception
$400,000 est. value
Lake Elmo, MN 55042

Lions Park Redevelopment - City of Hugo
New Construction, Infrastructure - 5,500 SF
Design
$1,000,000 CJ est. value
Hugo, MN 55038

4Front Technology and Office Campus
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Oakdale, MN 55128

Grading, Concrete and Bituminous Surfacing, and Lighting
Infrastructure
Bidding
$340,000 CJ est. value
Woodbury, MN 55125

Construction of Well #7 and Well #6 Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Forest Lake, MN 55025

2022 Bridge Transitions Renovation
Infrastructure
Sub-Bidding
$3,500,000 CJ est. value
Stillwater, MN 55082

Utility Potholing in Lake Elmo Park Reserve
Infrastructure
Post-Bid
Lake Elmo, MN 55042

Lift Station 6 Improvements
Renovation
Post-Bid
$1,215,445 est. value
Oakdale, MN

Hudson Road and Settlers Ridge Parkway Roadway and Intersection Improvements
Results
$3,000,000 est. value
Woodbury, MN 55125

Summers Landing 5th Addition Utility, Street Lighting Improvements
Results
Cottage Grove, MN

Well, Pumphouse No. 6 and Monitoring Well - W037 - City of Elmo
New Construction, Infrastructure
Conception
$2,700,000 est. value
Lake Elmo, MN

Tower Drive Water Main Rehabilitation
Infrastructure
Post-Bid
$565,000 est. value
Woodbury, MN

Lift Station 11 Improvements
Renovation
Results
Less than $553,000 est. value
Oakdale, MN

Watermain Trunk Watermains - W-038 - City of Lake Elmo
Infrastructure
Conception
$3,392,000 est. value
Lake Elmo, MN

Last Updated 08/17/2022 10:07 AM
Project Title

Mid Oaks Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Stillwater, MN 55082   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $388,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sewer Pump Station, Sewer and Water Construction, Electrical and Controls, Lift Stations/Lift Station Equipment, Water and Wastewater Facilities, Water/Wastewater Infrastructure, Construction. Description: The work includes the construction of approximately 1. Removal of miscellaneous items necessary to access the underground utilities. 2. Removal of the existing lift station equipment and piping in the Mid Oaks Lift Station. The project includes the removal of a portion of the existing dry well as shown on the plans. 3. Removal of existing lift station controls for Mid Oaks Lift Station. 4. Furnish and install new glass-fiber reinforced polyester (FRP) lift station insert and precast concrete valve vault structure, pumps, piping, and valves for Mid Oaks Lift Station. 5. Installation of Control Panel for Mid Oaks Lift Station. 6. Mid Oaks Lift Station will remain in service during changeover. All temporary bypass pumping of sewage required for the changeover is the responsibility of the CONTRACTOR and shall be coordinated with the City of Stillwater. 7. Other miscellaneous work shown on the plans. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office. Contact information and submittal procedures for such questions are as follows: 12224 Nicollet Avenue, Burnsville, MN 55337 Ph. 952-890-0509

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents