Similar Projects
2020 Bond - Police / Justice Center Expansion - City of Orange Beach
New Construction
Conception
$10,000,000 est. value
Orange Beach, AL

Provision of Painting and Drywall Services
Renovation
Design
$90,000 CJ est. value
Bay Minette, AL 36507

Lauderdale County Government Building Courthouse Annex Toilets
Renovation
Design
$200,000 est. value
Florence, AL

New Town Hall Complex
New Construction
Post-Bid
River Falls, AL

Elkmont Town Hall
New Construction - 2,417 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Elkmont, AL 35620

Design-Build Bridging Construction Services for The New U.S. Courthouse, Huntsville, AL
New Construction - 123,106 SF
Results
$60,000,000 to $70,000,000 est. value
Huntsville, AL

Bessemer Courthouse Elevator Modernization - Phase 2
Renovation
Results
$1,300,000 est. value
Bessemer, AL 35020

Pike County Judicial Center
Construction
$36,614,470 est. value
Troy, AL

Municipal Building Project
Renovation - 21,800 SF
Construction
$3,073,673 est. value
Hartselle, AL 35640

FBI Innovation Center
New Construction - 250,000 SF
Post-Bid
$1,300,000,000 est. value
Redstone Arsenal, AL

Renovations to Pelham City Hall
Renovation - 21,087 SF
Results
$3,145,000 est. value
Pelham, AL 35124

Construction of a New City Hall - City of Semmes
New Construction - 12,000 SF
Construction
$1,899,950 est. value
Semmes, AL

Summerdale City Hall Building Department Renovations
Renovation
Post-Bid
Summerdale, AL 36580

Courthouse Freight Elevator Upgrade
Renovation
Results
$141,692 est. value
Tuscaloosa, AL 35401

New City Hall
New Construction
Construction
$76,811,166 est. value
Huntsville, AL 35801

Last Updated 08/05/2022 09:10 AM
Project Title

Exterior Porch and Step Renovations at Perry County Courthouse

Physical Address View project details and contacts
City, State (County) Marion, AL 36756   (Perry County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**PLEASE NOTE: The estimated value listed for this project is for searchability purposes only and does not reflect the actual construction budget as determined by the owner. It should not be used for estimation purposes at this time.** Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. Renovations to the Exterior Columns Perry County Courthouse. Work includes, but is not limited to, exterior demolition of existing gypsum based stucco at Existing round classical column shafts, cleaning of existing brick substructure at the columns, installation of new stucco at the column shafts, and coordination of the entire project, and all related work required for project completion, as indicated on the Bid and Contract Documents. Certified check or bid bond payable to the Owner, for not less than five percent (5%) of amount of bid, but in no event more than ten thousand dollars ($10,000), must accompany each proposal. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by Architect or Owner; The bidder shall show such evidence by clearly displaying their current license number on the outside of the sealed envelope in which the proposal is delivered; Bidder must also include their current license number on the Proposal Form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of SIXTY (60) days. Performance and Payment Bond equal to 100% of the contract price will be required of the Bidder to whom the contract or any part(s) of the contract is awarded. complete all Base Bid and any Alternate Work of the Contract within 120 consecutive calendar days thereafter. Performance Bond shall also extend as a maintenance bond for one year after the date of acceptance of the entire project

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents