Similar Projects
New Elections Office - County of Lake
New Construction - 50,000 SF
Conception
$12,710,000 est. value
Tavares, FL 32778

Water Department Offices & Compound - City Of Eustis
New Construction, Infrastructure
Conception
$800,000 CJ est. value
Eustis, FL 32726

Tavares Solid Waste and Public Works Operations Facility
Design
Tavares, FL

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Construction MAC; Southeast
New Construction, Renovation
Post-Bid
Less than $48,000,000 est. value

Construction Manager at Risk (CMAR) Services - Public Works Facility
Results
Less than $12,800,000 est. value
Mount Dora, FL

Y--Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Firm Fixed Price Multiple Award Construction Contract, NAVFAC SE Area of Operations
Results
$20,000,000 to $900,000,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Indefinite Delivery-Indefinite Quantity Construction
New Construction
Post-Bid

Access Control Point Program Design Build II -- RFI(2)
Results

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

RFP - Tavares Square Project
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Tavares, FL 32778

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Last Updated 02/02/2023 05:23 PM
Project Title

Building Automation System Replacement at the CAB

Physical Address View project details and contacts
City, State (County) Tavares, FL 32778   (Lake County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

EB0007061 AA0003116 IB0001058 Only need to go to one of the mandatory pre bid meetings The purpose of this solicitation is to solicit competitive sealed submittals to furnish BUILDING AUTOMATION SYSTEM REPLACEMENT AT THE CAB for Lake County, Florida The last day to ask questions 11/09/2022. All work to be done per County approved plans. 2.2. Replacement of the BAS Gateway, communication wire, and field controllers. Basis of design shall be Honeywell controls or equal approved by County. 2.3. Replacement of field devices, sensors, and actuators. The existing device wiring is scheduled to remain. 2.4. Remove all BAS pneumatic controlled actuators and/or devices and pneumatic tubing. 2.5. Replacement of existing Merv 8 pre-filters with new Merv 13 pre-filters for both air handling units (AHU 2-1 and AHU 2-2) and outside air unit (AHU 3-1). 2.6. Addition of UV lights to all air handling units and fan coil units

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents