Similar Projects
Potter Road Solar Photovoltaic System- ARPA - 5112 - City of Wauwatosa
New Construction, Infrastructure
Conception
$365,000 CJ est. value
Wauwatosa, WI 53226

Walbec K&N Plant Solar Array / Lisbon
New Construction
Design
$500,000 est. value
Sussex, WI 53089

Dewey Substation Transformer Repairs
Renovation
Bidding
$500,000 CJ est. value
Milwaukee, WI 53207

Red Barn Wind Farm
Infrastructure
Construction
$162,000,000 CJ est. value
Wingville, WI 53569

Solar and Energy Storage Waupaca City Hall
Renovation
Results
$344,100 CJ est. value
Waupaca, WI 54981

Tyto Solar Farm
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Fitchburg, WI 53711

Substation Structure and Material Package
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Mount Horeb, WI 53572

Boilermaker and Millwright Services
Renovation, Term Contract
Post-Bid
Madison, WI

RFP D/B - Facility Solar Photo-Voltaic System Design and Build
Infrastructure
Post-Bid
$110,000 CJ est. value
Hayward, WI 54843

Last Updated 03/16/2023 02:03 PM
Project Title

OCI Power Plant Feed Water System Replacement - State of Wisconsin - Department of Corrections

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,348,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 16, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: CORRECTIONS - OAKHILL CORRECTIONAL INSTITUTION, OREGON This project includes the replacement of the existing feed water piping with a header system, new control valves and recirculation. In addition, the work will include a condensate tank and pumps for condensate storage and makeup water addition with a new chemical feed system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents