Similar Projects
Milwaukie / El Puente Elementary Safe Routes to School Improvements - City of Milwaukie
Infrastructure
Conception
$5,196,000 est. value
Milwaukie, OR

I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

Snow Plowing at Barlow Ranger District Compound and Billy Bob Sno-Park
Term Contract
Results
Government Camp, OR 97028

South End Road MP 3.8
Infrastructure
Results
$330,000 to $340,000 est. value
Oregon City, OR

Mount Tabor Yard Maintenance Facility and Multimodal Pathway Project
New Construction
Construction
$13,500,000 est. value
Portland, OR

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

OR 224 at SE Monroe St
Infrastructure
Design
$3,077,537 CJ est. value
Estacada, OR 97023

Salmonberry Drive Paving Project
Infrastructure
Post-Bid
$200,000 est. value
Oregon City, OR 97045

Webster Area Paving Project
Infrastructure
Results
$775,000 est. value
Oregon City, OR

Last Updated 05/22/2023 04:33 PM
Project Title

2018-2022 Pavement Management Program: 2022 Pavement Rehabilitation Projects

Physical Address View project details and contacts
City, State (County) Lake Oswego, OR 97034   (Clackamas County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project No-21-3196 SCOPE OF WORK: 1. Temporary signage, protection and traffic control 2. Replace stormwater catch basins 3. Construct curb ramp retrofits and/or new ramps 4. Asphalt concrete removal (grinding) 5. Complete manhole and other utility grade adjustments 6. Construction of asphaltic concrete pavement inlays and overlays 7. Traffic signal modifications 8. Install pavement markings 9. Performance of additional and incidental work as called for by the specifications and plans. QUESTIONS/CLARIFICATION: Questions about meaning or intent of the Bid Documents shall be submitted to the Project Manager Stefan Broadus by email at sbroadus@ci.oswego.or.us no later than seven (7) days prior to Bid Closing Time. If you have website questions concerning this invitation, please call Cindy Waggener at 503.635.0289. Clarifications to the Bidding Documents will be made by addenda only. Oral statements may not be relied upon and will not be binding or legally effective MILESTONE COMPLETION: Milestone completion shall be July 8, 2022 for the Patching For Slurry Seal work (4 INCH ASPHALT CONCRETE PAVEMENT REPAIR pay item). Milestone completion shall be August 26, 2022 for Bryant Road and Fosberg Road. COMPLETION: Project Substantial Completion shall be September 30, 2022 and Project Final Completion shall be 28 days from Substantial Completion. Engineers Estimate: $4,750,000 to $5,250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents