Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

CA FTBL Dumont Dunes (1), Dumont Dunes Road
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Last Updated 08/18/2023 08:12 AM
Project Title

Fontana Safe Routes to School Gap Closure

Physical Address View project details and contacts
City, State (County) Fontana, CA 92335   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $230,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of installing Americans with Disabilities Act (ADA) compliant sidewalks and access return ramps, curb and gutter, street signing and striping to include bike lanes, the retrofitting/removal and the replacement of non-compliant sidewalk and curb within the project limits. This project will also include high-visibility crosswalks and street lighting. The proposed project is located within the City of Fontana on multiple roadways bordered by San Bernardino Avenue, Catawba Avenue, Valley Boulevard, and Juniper Avenue. Question Deadline 07/29/2023 at 2:00 PM Any questions pertaining to this project should be directed to Sid Lambert at phone number (909) 350- 7678 or email at slambert@fontana.org. The Contractor shall complete all work in every detail, within 90 Working Days after the date of Notice to Proceed, Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Contract Documents. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of ninety (90) calendar days. The City reserves the right to reject any or all bids or waive any irregularity in any one or all bids received.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents