Similar Projects
Statewide Network Management System
Bidding

Re-Open of Fiber Optic Atms Maintenance, Repair and Installation
Term Contract
Bidding

Fiber Optic Atms Maintenance, Repair and Installation
Term Contract
Post-Bid
UT

Submit a Quote to Provide, Install, and Maintain a 1GB Ethernet Service On The IGO Bulletin Board from Bldg 116, Rm 216A, 116 Pollock Rd, Salt Lake City, UT 84113 To Bldg 210, Rm 163, 765 North 2200 West, Salt Lake City, UT, 84116.
Post-Bid
Salt Lake City, UT 84116

To Procure Telecommunications Services and Equipment.
Results

Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Results
$700,000,000 est. value

Camera Lowering Pole System- Stage 1
Term Contract
Post-Bid
UT

National Physical Security (NPSP) Maintenance and Installation
Results
Less than $29,000,000 est. value

Provide, Install, And Maintain A 10Gbe (Gigabit Ethernet) Over Otn (Otu-2) Commercial Lease Between Bldg 12953, Rm 0720, Draper Army National Guard, 12953 Minute Man Dr., Draper, Ut And (Ujewhil030) I
Post-Bid
Draper, UT

Elk Run Elementary School and Neil Armstrong Academy Security Remodels
Results
Magna, West Valley City, UT 84044

Provide, Install, and Maintain a 10GBE (Gigabit Ethernet) over OTN (Otu-2) Commercial Lease between Bldg 12953, Rm 0720, Draper Army National Guard, 12953 Minute Man Dr., Draper, Ut and Bldg 730 Rm 13
Post-Bid
Draper, UT

Commercial Ethernet Gateway (CEG) - Continental United States (CONUS) Region One
Results

RFI - Home Intrusion Detection Systems
Post-Bid

Beehive and Lake Ridge Elementary Security Remodel
Results
Magna, UT 84044

Lease, Install and Maintain a Measured Business Line (3Khz Voice) at 1201 North 4000 West; Salt Lake City, UT 84116
Post-Bid
Salt Lake City, UT

Reported 03/26/2020 12:00 AM
Project Title

Rental of Mobile Latrines, Showers, & Hand Washing Stations for Cybershield Exercise

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: 1. One (1) 16 shower-head trailer to be delivered 22 APR 2020 IVO Building 4100 on Camp Williams, UT. a. The showers will be picked-up, hauled away and emptied by the contractor at the end of the service contract on 11 MAY 2020. b. The contractor provides all vehicles, moving assets, equipment, drivers, and support personnel to both deliver, and legally haul away the shower trailers. c. The contractor will service the shower trailers weekly by refilling the fresh water tank and emptying the grey water tank. The contractor incurs all costs involved with emptying the trailer. d. The contractor will provide fresh water tanks with a minimum capacity of 3,000 gallons for the shower trailer and grey water tanks with a minimum capacity of 3,000 gallons. e. The shower trailers will have an on demand pressurization pump, all fluid transfer lines, clamps, and installation hardware needed for connection of the on demand pressure pump to the fresh water supply tank as required for pressurized water supply to showers. f. The shower trailer will have a water heating system. 2. Twelve (12) portable latrines and three (3) hand washing stations to be delivered 22 APR 2020 IVO Building 4100 on Camp Williams, UT. a. The latrines and hand washing stations will be picked-up, hauled away, and emptied by the contractor at the end of the service contract on 11 MAY 2020. b. Cyber Shield personnel will provide paper towels, soap, and water for the hand washing stations. b. Cyber Shield personnel will provide toilet paper for the portable latrines. c. The contractor will provide three (3) weekly services for the three (3) week exercise to the portable latrines and be available to respond to a request for earlier service due to a surge in latrine usage. d. The contractor provides: all vehicles, moving assets, equipment, drivers, and support personnel to both deliver, set-up, take down, and removal of the portable latrines.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents