Similar Projects
Northeast Substation Generation Addition
Renovation
Sub-Bidding
$600,000 CJ est. value
Blue Earth, MN 56013

LED Lighting Supplies
Infrastructure
Post-Bid

LED Lighting Supplies
Infrastructure
Post-Bid

2022 Osseo Senior High East Wing LTFM
Alteration
Results
$4,000,000 est. value
Osseo, MN 55369

Digital Controls Conversion
Alteration
Results
$776,000 est. value

Furnishing Electrical Materials
Renovation, Infrastructure
Post-Bid
Alexandria, MN 56308

50th Street West and Broadway Street Northeast Signal - Pedestrian Improvements and Fiber
Alteration
Results
$175,000 est. value
Minneapolis, MN 55467

Traffic Signal Cable
Infrastructure
Post-Bid
Minneapolis, MN

Schneider Theatre Lighting System
Alteration
Results
Bloomington, MN 55431

Minneapolis Solar
Alteration
Post-Bid
Minneapolis, MN

2022 Electrical Infrastructure Program P13
Alteration
Results
MN

2022 District Wide LED Lighting
Alteration
Post-Bid
Brooklyn Park, MN 55429

Electrical Switchgear Replacements (STH)
Alteration
Results
Minneapolis, MN

LED Lighting Upgrades
Alteration
Post-Bid
Farmington, MN

Digital Controls Conversions
Alteration
Results
$415,000 est. value
Moorhead, MN

Last Updated 05/06/2023 02:31 PM
Project Title

Contruction of Electrical Vault and Equipment Replacement

Physical Address View project details and contacts
City, State (County) Glyndon, MN 56547   (Clay County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $232,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Electrical Vault & Equipment Replacement: Mobilization, airport safety & traffic control, demolition, conduit, conductor, electrical vault, constant current regulators, lighting control panel, radio control equipment and site restoration. A bidder that has doubt as to the true meaning of a project requirement may submit to the Owner's Engineer a written request for interpretation no later than 7 days prior to bid opening Question Deadline 04/27/2023

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents