Similar Projects
2021 Surface Sealing Project
Bidding
$25,000 est. value
Littleton, CO

Iliff Avenue Corridor Improvements Project
Bidding
CO

Monaco at Belleview Northbound Right Turn Lane Project
Post-Bid
Greenwood Village, CO 80112

2020 Intersection Improvement Projects
Post-Bid
Greenwood Village, CO 80112

Concrete Panel Removal and Replacement, Joint Sealing, Dowel Bar Retrofit, Full Depth Repair, Asphalt Resurfacing, and Pavement Markings
Results
$1,000,000 to $5,000,000 est. value

Yosemite-Caley Westbound Right Turn Extension
Results
Greenwood Village, CO 80111

Mountain Sky Infrastructure Project
Post-Bid
Centennial, CO

2019 Intersection Safety Improvements at Federal Boulevard and Bowles Avenue
Results
$500,000 to $600,000 est. value
Littleton, CO 80120

Spring Valley Metropolitan District 1 – County Road 13, 174 And 178 Construction Project
Post-Bid
Englewood, CO

Removal of Asphalt (Planing), SMA, Concrete Sidewalk, Concretecurb Ramp, Concrete Median Cover, Signing, Striping, and Traffic Control
Results
$1,000,000 to $5,000,000 est. value

Family Sports Center Reclaimed Water Connection
Post-Bid
Centennial, CO

Rehabilitating Curb Ramps on SH83, SH86, SH85 and I-25
Results
$1,000,000 to $5,000,000 est. value

Resurfacing Santa Fe by Diamond Grinding the Two Mainline Travel Lanes of the NB and SB Lanes
Post-Bid

Milling and Overlay of Belleview Between I25 and University Including Curb Ramps
Results
$1,000,000 to $5,000,000 est. value
CO

2020 Service Line Replacement Project
Post-Bid
Centennial, CO

Reported 02/18/2020 12:00 AM
Project Title

Reunion Ridge Filing No. 1 District Improvements

Physical Address View project details and contacts
City, State (County) Centennial, CO   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $13,000,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction utilities, roadway, and drainage infrastructure for the Reunion Metropolitan District associated with Reunion Village 9 located in an undeveloped area south of 104th Avenue and west of Potomac Street in Commerce City, CO. Utility improvements include potable & non-potable water lines and sanitary sewer. Roadway improvements include curb and gutter, sidewalk, asphalt and concrete pavement, traffic signals, pavement markings, and signage. Drainage improvements include underdrain, storm sewer, and detention pond construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents