Similar Projects
ISU Lecture Center: Chiller Replacement
Renovation
Design
$195,000 CJ est. value
Pocatello, ID 83209

2 Replacemant HVAC Systems for Relay Ridge Repeater Site
Renovation
Sub-Bidding
$340,000 CJ est. value
Boise, ID 83702

Air Handling Unit Installation Project
Alteration
Post-Bid
Burley, ID

Replace Chiller, Data Room
Alteration
Post-Bid
$179,000 est. value
Boise, ID 83702

HVAC System Replacement
Renovation, Alteration
Results
Potlatch, ID

Gas Fired Boilers
Alteration
Results
Less than $200,000 est. value
Twin Falls, ID 83301

HVAC and Fire Sprinkler Upgrade
Alteration
Post-Bid
$2,228,000 est. value
Orofino, ID 83544

Magic Valley Regional Airport - Terminal Heat Pump Replacement
Alteration
Results
Twin Falls, ID 83301

NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

Replace Roof and Upgrade HVAC Units, Canyon County Center,College of Western Idaho
Alteration
Post-Bid
$765,000 est. value
Nampa, ID 83651

Dehumidification Replacement
Alteration
Results
Idaho Falls, ID

Burley Junior High School HVAC Upgrades
Alteration
Post-Bid
$580,000 est. value
Burley, ID 83318

Center Chiller Replacement
Alteration
Results
$360,000 est. value
Boise, ID 83725

Advantage Plus Credit Union Boiler Replacement
Renovation
Post-Bid
$400,000 CJ est. value
Pocatello, ID 83201

Last Updated 08/29/2022 11:31 PM
Project Title

Water Quality Lab Boiler Replacement

Physical Address View project details and contacts
City, State (County) Boise, ID 83702   (Ada County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Public Works Department is seeking bids for replacement of an existing hot water boiler. This work will include procurement of a new hot water boiler, removal of an existing boiler and installation of the new boiler. The new boiler will be connected to existing water piping and electrical wiring. The Project base bid generally consists of demolition of an existing boiler and installation of a new boiler with re-piping of supply gas, hot water system, exhaust flue, electrical and associated systems and control panels, and other appurtenances required for a completely operational boiler heating system as specified within the Project Manual; and paying all associated state and local taxes, complete. Bid Bond 5% Question Deadline 08/26/2022 at 12:00 PM MT request clarifications, or protest the requirements, standards, specifications or processes outlined in this Request for Bid may submit a written notification to the Purchasing Office Tammi Leatham City of Boise, Purchasing 150 N. Capitol Blvd. Boise, ID 83702-0500 Fax: 208.384.3995 Email: tleatham@cityofboise.org

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents