Similar Projects
Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka
Renovation
Conception
$3,598,000 est. value
Topeka, KS 66612

East Filters Rehabilitation Phase II - 281102.01 - City of Topeka
Renovation
Conception
$5,185,000 CJ est. value
Topeka, KS 66612

WTP2: Chemical Feed Modification - 5-C-026-20 - City of Olathe
Renovation, Infrastructure
Design
$2,390,000 CJ est. value
Lenexa, KS 66227

Replacement Pumps for Return Activated Sludge (RAS)
Renovation
Bidding
$30,000 CJ est. value
Topeka, KS 66616

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

City of Wichita Northwest Water Facility (NWWF)
Addition
Construction
$20,000,000 CJ est. value
Wichita, KS 67203

Lime Feed Building and Basin Modifications at Water Treatment Plant No. 2 / Olathe
Renovation
Pending Verification
$11,000,000 CJ est. value
Olathe, KS 66051

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

Turkey Creek WWTF Miscellaneous Improvements
Renovation
Results
Mission, KS 66202

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

Last Updated 09/28/2022 10:47 AM
Project Title

Hansen Water Treatment Plant Facility 1 Improvements Phase I

Physical Address View project details and contacts
City, State (County) Kansas City, KS 66106   (Wyandotte County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $10,397,425 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The site of the project is located at 7601 Holliday Drive, Kansas City, Kansas 66106 The proposed Work is generally described as follows: The Work includes removal and replacement of the existing basin equipment in Primary Basins No. 3 and No. 4; removal and replacement of the existing lime slaking and feed system; and removal and replacement of the existing alum metering pumps for Facility 1 at the Hansen Water Treatment Plant, including structural, electrical and instrumentation system improvements and all other work as indicated on the drawings and as specified. Contractor shall complete all Work as specified or indicated in the Contract Documents based on the acceptance by Owner of Contractor's Bid.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents