Similar Projects
D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Z--Chiricahua National Monument (Chir) Requires The Construction Services
Renovation
Results
$100,000 to $250,000 est. value
Willcox, AZ 85643

Michaelson Building Renovation
Renovation
Post-Bid
Globe, AZ

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for New Construction, Renovation, and Repair of General Building Construction at Various Government Installations
New Construction, Renovation
Post-Bid

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

IDIQ MACC Small Business Set-Aside for New Construction, Renovation, and Repair of Dry Utilities Construction Projects at Various Government Installations In CA, AZ, NV, UT, CO, and NM
New Construction, Renovation, Term Contract
Post-Bid
$300,000 to $20,000,000 est. value

Sources Sought for Construction Services IDIQ
New Construction, Renovation
Post-Bid
$2,000 to $5,000,000 est. value

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

RFQ - On-Call Design/Architectural Services
Term Contract
Design
Globe, AZ 85501

RFQ - On-Call Engineering Firm Consulting Services
Term Contract
Conception
Globe, AZ 85501

Last Updated 10/06/2022 10:25 AM
Project Title

Michaelson Building Renovation

Physical Address View project details and contacts
City, State (County) Globe, AZ 85501   (Gila County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected September 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 24, 2022, the Michaelson Project is on hold with no date to rebid at this time.** Notice is hereby given that Gila County is requesting Bids from qualified Contractors to provide Michaelson Building Renovation. All requests for additional information shall be put in writing and directed to: Betty Hurst, Contracts Administrator, (928) 402-4355, bhurst@gilacountyaz.gov. Demolition - Existing roof system to be removed. Contractor will provide all necessary equipment and tools to complete the demo and haul away the debris. Gila County and the City of Globe will coordinate on a traffic control plan for the demolition phase. The Contractor shall be responsible for the design and erection of all safeguards necessary to protect the existing structure. The Contractor shall submit a detailed plan, including work sequence, prepared by a professional engineer licensed in the State of Arizona for shoring, bracing, and other safeguards to maintain all parts of the structure in a safe condition during the process of demolition and construction, and to protect from damage those portions of the existing structure which are to remain. Submit plan prior to beginning work. Roof and Skylights - Contractor will construct a new roof system per the Architectural, Structural, Mechanical, and Plumbing plans. The Contractor will be responsible for obtaining the manufacture's engineered truss design as shown by the Structural Engineer to coordinate with the mechanical system design for unit placement and main duct runs. The Contractor shall field verify the dimensions, elevations, and other requirements necessary for the proper construction and alignment of the new portions of the structure to the existing structure. The Contractor shall make all measurements and calculations necessary for the fabrication and erection of structural members. The Contractor shall coordinate with all the contract documents and any discrepancies shall be brought to the attention of the Architect and Gila County. The Contractor will provide all necessary equipment and tools to complete a new dried in roof system. This includes a crane to fly and set the trusses. Gila County and the City of Globe will coordinate on a traffic control plan for this phase of the construction. Coordinate installation of all mechanical system curbs with the Mechanical Contractor as identified on the mechanical drawings. More information on the roofing materials to be used for this project can be found on pages A5 & A6 of the Architectural drawings, S1 thru S3 of the Structural drawings, and pages 14 - 15 in the Technical Specifications. Bid skylight rough opening framing and new skylight installation as alternate #1 as listed on page 5 of the Technical Specifications. Mechanical - A comprehensive review and understanding of all associated plans, drawings, and specs will be required by the Contractor to complete the work in a professional manner. The Contractor shall be responsible for obtaining all equipment and components that are found in the mechanical drawings to complete (5) new separate working HVAC systems. Special attention must be paid to the Structural and Architectural drawings for placement of the mechanical units within the truss webbings. The Contractor shall coordinate work with all other trades prior to installation to provide clearances required for proper operation, maintenance, code compliance, and to verify non-interference with other work. Do not fabricate prior to verification of necessary clearances for all trades. Bring any interferences or conflicts to the attention of Gila County and the Architect/ Engineer before proceeding with fabrication or equipment orders. Any substitution of materials or equipment must be submitted to the engineer to make the final determination of whether the substitution is equivalent. Electrical - Contractor will be responsible for providing all equipment, materials, components, and labor for the installation of (2) new electrical panels and all other components to complete the electrical circuits of each floor separately as shown in the electrical drawings. Contractor will also be responsible for providing power to all HVAC system disconnects. Mechanical Contractor will be responsible for the wiring from the disconnect to the individual HVAC units. Plumbing - The Plumbing Contractor will be responsible for the installation of new piping as identified on the plumbing portion of the engineering plans. This may require transitioning from existing piping to new

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents