Similar Projects
Gateway Middle School - Additions & Renovations (Roofing Construction)
Bidding
Monroeville, PA 15146

On-Call General Construction and Roofing
Bidding
Pittsburgh, PA

Sewage Treatment Plant (Secondary Process Building) Roof Replacement
Post-Bid
Tarentum, PA 15084

Energy Plant/Power Substation Roof Replacement - (General)
Post-Bid
West Mifflin, PA 15122

Roof Repair on Communications Building 405
Results
$100,000 to $250,000 est. value
Coraopolis, PA

Low-Slope EPDM Roof Replacement at Clairton Municipal Building
Results
Clairton, PA 15025

Old Conservatory West Wing Roof Restoration and Replacement
Renovation
Construction
$162,431 est. value
Pittsburgh, PA 15123

Congregation Beth Shalom Roofing and Solar Project
Renovation
Construction
Pittsburgh, PA 15217

Roof Renovations
Bidding
Jefferson Hills, PA

Roof Replacement for Selected Middle School Roofs
Post-Bid
Pittsburgh, PA 15219

Allegheny L/D No. 2, Replace Operations Building Powerhouse Roof
Results
$25,000 to $100,000 est. value
Pittsburgh, PA 15206

Elizabeth Seton Center Roof Replacement
Construction
Pittsburgh, PA 15226

CITF GEDF McKeesport Heritage Center Roof Replacement Project
Post-Bid
Pittsburgh, PA

Roofing and Mechanical Upgrades at Manchester, East Liberty, and West Mifflin Garages
Results
$1,000,000 to $6,000,000 est. value
PA

Holy Family Institute Main Building Roof Replacement
Renovation
Post-Bid
Pittsburgh, PA 15202

Reported 01/13/2021 12:00 AM
Project Title

Remove Existing Roof and Install New EPDM Roof

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15219   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove Existing Roof and Install New EPDM Roof at 2290 Bedford Ave, Pittsburgh PA, 15219. Work to be performed: 1. Tear off existing built-up roofing on main roof and pop-up roof 2. Remove wall flashings 3. Tear out metal gutter lining 4. Inspect roof deck 5. Install insulation to roof deck -R-30 6. Install required RFS strips 7. Fully adhere .060 EPDM membrame to deck and walls 8. Flash corners and pipe penetrations 9. Install proper wood blocking and new plywood to pop-up to be able to install EPDM 10. Install new vent in wall of pop-up 11. Line box gutter with EPDM and flash to specifications 12. Wall tie-in will need to be flashed to neighboring roofs 13. Install counter flashing on chimney and drip edge at front of roof 14. All work to be done to Manufacturer's Specification and include 20 year warranty 15. Clean up all debris and dispose of properly

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents