Similar Projects
Old County Courthouse Rehabilitation
Renovation
Design
CO

East Nottingham Park Improvements
Renovation
Design
Avon, CO 81620

Moffat County Courthouse
Renovation - 94,602 SF
Bidding
$25,000,000 est. value
Craig, CO 81625

Town Hall Repairs
Renovation
Bidding
Larkspur, CO 80118

Justice Center Locker Room Remodel Project
Renovation - 3,635 SF
Post-Bid
Castle Rock, CO 80109

Town Hall Remodel Project
Renovation
Post-Bid
Avon, CO 81620

Office Remodel North Campus Ih-19035/B6 & B10
Results
Less than $75,000 est. value
Denver, CO

Castle Pines City Hall - Construction Management/General Contracting Services
Results
Castle Pines, CO 80108

Centennial Courtroom Addition/Remodel
Addition - 7,425 SF
Construction
$1,000,000 to $1,500,000 est. value
Greeley, CO 80631

Exterior and Interior Renovation
Renovation - 51,495 SF
Construction
Telluride, CO 81435

Treasurer's Office Enclosure
Addition
Bidding
Central City, CO 80427

On Call Contractors for Various Trades
Renovation
Post-Bid
CO

Public Works Shop Addition
Addition - 384 SF
Results
$50,000 to $60,000 est. value
Poncha Springs, CO 81242

Construction Manager Services for the New Archuleta County Combined Courts Facility
New Construction - 17,000 SF
Construction
CO

Town Hall Restoration Project
New Construction
Post-Bid
Palmer Lake, CO

Last Updated 08/10/2021 12:07 PM
Project Title

Removal Reconstruction and Upgrades to The Roof of The Palmer Lake Town Hall

Physical Address View project details and contacts
City, State (County) Palmer Lake, CO 80133   (El Paso County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Palmer Lake Town Hall is a historic structure. The trusses of the roof are thoroughly damaged and currently cause a hazard, as the entire top portion requires replacement. The circumstances of this damage are covered by the Town’s insurance. Currently, the roof is temporarily shored in order to utilize the building in limited fashion. It is imperative that this work be timely and safe. Scope of Work. Bids shall include upgraded electrical work for the ceiling area only. Reference to all material is laid out in the enclosed documents provided by an Engineer. Contractor shall be responsible to protect the interior of the building through all inclement weather. The Town of Palmer Lake may request supplementary work including, but not limited to, updating restroom(s) and entrance for ADA compliance, upgrading electrical throughout building, and possible plumbing.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Trusses.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents