Similar Projects
Ballantyne Reimagined - Private Road Work
Design
Charlotte, NC 28277

Pediatric ED Addition and Parking Expansion
Addition
Design
Huntersville, NC 28078

Road Improvement Project
Infrastructure
Bidding
$6,000,000 est. value
Pineville, NC 28134

Full Delivery Projects to Provide Stream and Riparian Wetland Mitigation Credits within the Cataloguing
Term Contract
Bidding
Charlotte, NC

Gosnell Drive Culvert Replacement
Post-Bid
Charlotte, NC 28227

Westinghouse Multi-Use Path
Post-Bid
$4,079,410 est. value
Charlotte, NC

Modifications to J.W. Clay Boulevard and Robert D. Snyder Road
Results
Charlotte, NC

West Branch Rocky River Tributary Rehabilitation
Results
Charlotte, NC

Full Delivery Projects to Provide Non-Riparian Wetland Mitigation Credits within the Cataloguing
Term Contract
Bidding
Charlotte, NC

Lakeview Road Improvements - Clearing of Utilities
Post-Bid
$20,000 to $40,000 est. value
Charlotte, NC 28272

Intersection Improvements on NC 51 at Sam Newell Rd (SR 3474) and North Trade St (SR 5612) in Mecklenburg County
Results
Matthews, NC 28105

Construction Of Downtown Greenway - Phase 1 Trailhead
Post-Bid
Huntersville, NC

Grey Road Sidewalk and Storm Drainage Improvements
Results
$500,000 est. value
Davidson, NC 28036

Bent Creek Culvert Repair
Post-Bid
Charlotte, NC 28227

Main Street Upgrades Project
Results
Huntersville, NC 28078

Last Updated 06/08/2022 01:03 PM
Project Title

North End Around Taxiway (N.E.A.T.) Package 1- Charlotte Douglas International Airport

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will perform the majority of the grading, storm drainage, and Modifications to the Navigational Aid System (NAVAIDs) Major work consists of clearing and grubbing, Demolition, erosion and sediment control, earthwork, storm drainage, and utility infrastructure necessary to prepare for subsequent construction packages. Site is over 200 acres and 1,880,000 cubic yards of earth will be moved. Over 60 new storm drain manholes, inlets, and headwalls will be installed and c 14,000 linear feet of new storm drain pipe, 2 miles of new chain link fencing and gates Overall Contract time 630 calendar days Intermediate completion time Milestones #1 Airport Overlook Road Closure – 84” Pipe Installation.19 days #2 Old Dowd Road Closure – 54” Pipe Installation.60 days #3 RW 18C Approach Glideslope – 75 days deadline March 26 2023 #4 RWY 18C Approach MALSR – 120 Days deadline May 10, 2023 #5 RWY 36C Approach Localizer – 180 Days beginning Jan 10 2023 deadline July 9th 2023 Construction subcontractors trades services and materials sought – General: Surveying, Materials testing, temporary-facilities, Traffic Control barricades and devices, flagging, SIDA access point security and crossing guards, vacuum trucks, – Site Prep: Erosion Control, removal of drainage, Civil Demo, Haul roads – Drainage & Ut: Precast Drainage, RCP pipe, Pipe inspections, precast structures – Import Materials: Dump truck Hauling, Stone aggregates, riprap – Asphalt Paving: Asphalt Paving in place; Asphalt Milling, Asphalt hauling, binder, tack coat – Pavement: Saw cutting, Marking Removal and Striping and marking – Electrical: Temporary Electrical, Navaids, Airfield lighting, Ductbank and conduit, Signs, 2? & 4? HDPE Directional bore, – Site Work, Soil Nail Wall, retaining wall, Fencing, Guardrail, Signs, Seeding, Matting, concrete slabs, wheel-stops

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Airfield Signaling and Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents