Last Updated | 08/24/2022 03:35 PM |
Project Title | Fire Truck Building Project at The Woodville Training Site (WTS) |
Physical Address | View project details and contacts |
City, State (County) | Woodville, ME 04457 (Penobscot County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Aircraft Hangar, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,382,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Department of Defense, Veterans and Emergency Management (DVEM) is conducting a competitive bid process for the Fire Truck Building Project at The Woodville Training Site (WTS) in T2 R9 TWP, Maine. Project consists of two significant construction activities. The first is the construction of an 1,800-sf new construction concrete masonry unit (CMU) building with light gauge metal pre-engineered roof trusses to provide storage for two US Army Type 6 Wildland Firefighting vehicles and associated wildland firefighting equipment. The new building will be constructed on an existing gravel area on a frost wall with slab. Utility work will include domestic water, power, site lighting, propane tanks, communications, and stormwater. The second significant construction activity is the construction of new overhead single phase electrical utility line from the nearest last utility owned pole to the new facility. The length of this new power line is approximately 10,000 linear feet. The detailed Notice to Contractors is on the Bureau of General Services website. Project consists of two significant construction activities. The first is the construction of an 1,800-sf new construction concrete masonry unit (CMU) building with light gauge metal pre-engineered roof trusses to provide storage for two US Army Type 6 Wildland Firefighting vehicles and associated wildland firefighting equipment. The new building will be constructed on an existing gravel area on a frost wall with slab. Utility work will include domestic water, power, site lighting, propane tanks, communications, and stormwater. The second significant construction activity is the construction of new overhead single phase electrical utility line from the nearest last utility owned pole to the new facility. The length of this new power line is approximately 10,000 linear feet. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |