Similar Projects
Door Repair and Replace
Alteration
Design
Eastover, SC 29044

Charleston - MRD Licensing Customer Service Window (Rebid)
Demolition, Renovation, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Charleston, SC 29412

Window and Door Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Barnwell, SC 29812

Install Window Tinting
Alteration
Post-Bid
Summerville, SC 29483

Chester County Courthouse Window Improvements
Alteration
Post-Bid
Chester, SC 29706

5670--Manual Roll Down Storm Protection ( Provide and Install)
Results
Columbia, SC 29209

Carnegie Library Window Restoration
Alteration
Results
$117,711 est. value
Beaufort, SC

Lexington Community Mental Health Center Window Replacement Phase II
Renovation
Sub-Bidding
$85,000 CJ est. value
Lexington, SC 29072

Chester County Museum Window Improvements
Alteration
Post-Bid
Chester, SC 29706

Window Replacement at Saint George Annex Building
Alteration
Results
Saint George, SC 29477

Locksmith Services (Master-Keyed Lock System)
Term Contract
Sub-Bidding
Saint Matthews, SC 29135

District Office Window Replacement
Alteration
Post-Bid
Ridgeland, SC 29936

PBHPH Positive Latching Door Install
Alteration
Results
Anderson, SC 29621

UOFSC Replace Russell House Door Entry
Alteration
Post-Bid
Columbia, SC 29208

Building 320 Modifications, Apron and Taxilane
Infrastructure, Alteration
Results
Myrtle Beach, SC 29577

Last Updated 03/21/2023 05:33 PM
Project Title

Carolina Forest High School Window Replacement (Rebid)

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC 29579   (Horry County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of glazing in storefronts and windows, as required, along with potential areas of storefront material. The purpose and intent of this Invitation for Bids is to establish a contract for the provision of services based on the attached specifications and guidelines. The project involves Partial Roof Replacement, approximately 16,502 SF. The project includes replacement of exterior glass and storefront at various locations throughout. Alternates include interior roller shades at select locations and replacement of entire storefront in lieu of individual panels at select locations. The project is ESSER III Funded. Contractor has access to the site beginning 6/5/2023 and shall continue through 8/11/2023. Location- Carolina Forest High School 700 Gardner Lacy Road Myrtle Beach SC 29579 All questions must be submitted in writing to the District Bid Contact Person by 12:00pm (noon) on 2/8/2023 Substantial Completion: August 8, 2023 Final Completion of all work and punch list: August 18, 2023 First day of Students: August 21, 2023

Details

16,502 SF.
Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents