Similar Projects
T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

The Coronet At 21st
New Construction, Infrastructure - 2,587 SF
Design
$4,200,000 CJ est. value
Harrisburg, PA 17101

Home2Suites Hotel / Swatara Township
New Construction, Infrastructure - 64,878 SF
Design
$8,000,000 CJ est. value
Swatara, PA 17111

Honeymoon Trail Rd Over Tributary to Pine Creek
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Lykens, PA 17048

Honeymoon Trail Rd Over Tributary to Pine Creek
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Lykens, PA 17048

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wiconisco Water Storage Tank - Site Prep
Infrastructure
Results
$95,000 est. value
Lykens, PA

Rheems Water Main Replacement
Infrastructure
Results
Elizabethtown, PA

The Hershey West End Project
Infrastructure
Construction
Hummelstown, PA 17036

Catherine Hershey Schools for Early Learning / Harrisburg
New Construction, Infrastructure - 46,963 SF
Construction
$5,000,000 CJ est. value
Harrisburg, PA 17102

Eisenhower Boulevard Flexible Space Building
New Construction, Infrastructure - 78,000 SF
Pending Verification
$8,000,000 CJ est. value
Middletown, PA 17057

I-83 South Bridge Project
Demolition, New Construction, Infrastructure
Pending Verification
$650,000,000 CJ est. value
Hummelstown, PA 17036

Fairville Avenue over I-81
Infrastructure, Renovation
Conception
$2,725,000 CJ est. value
Hummelstown, PA 17036

Last Updated 04/27/2023 03:20 PM
Project Title

US 322 and Chambers Hill Road

Physical Address View project details and contacts
City, State (County) Swatara, PA 17111   (Dauphin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $38,561,349 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The SR 0322 and SR 2019 Grayson/SR 3006 Chambers Hill Road signalized intersection is being reconstructed to 4 approaches with left turn lanes removed from SR 0322. One through lane in each direction is added and SR 0322 EB left turns are replaced via a new SR 0322 EB jughandle with signal at Witmer Road and SR 0322 WB left turns are replaced via a new roundabout with bypass lanes at the SR 2019 Milroy/Grayson Roads intersection. Three retaining walls accommodate the widening and geometry, addition of dynamic message signs, stormwater management basins, drainage, guide rail/barrier, signs and pavement markings upgrades, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for State Route 0322, Section 050, in Dauphin County, Swatara Township, from Mushroom Hill Road to Bridge Road at Segments 0090/2535 (0091/2574) to 0150/2314 (0151/2354), for an overall project length of 12,797.00 linear feet (2.424 miles). Project Cost Range: $35,000,000.00 - $39,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 26.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Highway Reconstruction 408 Version: 2020-5 PennDOT - US 322 and Chambers Hill Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents