Similar Projects
Milwaukee - Fond Du Lac Const / Bridge Rehab
Infrastructure
Conception
$14,000,000 CJ est. value
Hartford, WI 53027

Milwaukee - Fond Du Lac Const / Bridge Rehab
Infrastructure
Conception
$14,000,000 CJ est. value
Hartford, WI 53027

Capstone 41 Business Park Phase II and Phase III
New Construction, Infrastructure - 294,600 SF
Design
$316,400,400 CJ est. value
Germantown, WI 53022

N'Dulge Salon
New Construction, Infrastructure - 1,600 SF
Design
$350,000 CJ est. value
West Bend, WI 53095

2023 Cured-in-Place-Pipe Lining Project
Infrastructure
Bidding
$300,000 CJ est. value
Germantown, WI 53022

2022 Road Program - Town of Erin
Infrastructure
Post-Bid
$450,000 CJ est. value
Erin, WI 53027

2022 Road Program - Town of Erin
Infrastructure
Post-Bid
$450,000 CJ est. value
Erin, WI 53027

2021 Road Program
Infrastructure
Results
$230,545 CJ est. value
Erin, WI 53027

2021 Road Program
Infrastructure
Results
$230,545 CJ est. value
Erin, WI 53027

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Apple Works Winery Expansion
New Construction, Infrastructure - 600 SF
Pending Verification
$30,000 CJ est. value
Germantown, WI 53022

Apple Works Winery Expansion
New Construction, Infrastructure - 600 SF
Pending Verification
$30,000 CJ est. value
Germantown, WI 53022

S Main Watermain Replacement - 350-15-300 - City of Hartford
Infrastructure
Conception
$374,000 CJ est. value
Hartford, WI 53027

285 Sand Drive Senior Living
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
West Bend, WI 53095

Last Updated 07/22/2023 07:32 AM
Project Title

STH 83 - Hartford to Chenequa

Physical Address View project details and contacts
City, State (County) Hartford, WI 53027   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,257,794 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

20230711003 1330-22-70 Grading, Base, Milling, Asphalt Pavement, Curb and Gutter, Sidewalk, Guardrail, Signs, Pavement Markings, Box Culvert Construction, Retaining Wal Work Type: AD DBE Goal: 0% Completion Date Contract: June 28, 2024 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, banks check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. WI DOT - 003 - STH 83 - Hartford to Chenequa The work under this contract shall consist of removing structure R-66-0080, removing 2-72"x48" corrugated steel pipe arch culverts, removing concrete block endwalls, removing traffic flashing beacons, removing concrete pavement, removing asphaltic surface milling, removing curb & gutter and concrete sidewalk, removing guardrail, excavation common/marsh, excavation for culverts, excavation for retaining walls, maintaining temporary drainage, backfill structure, base aggregate, base patching, asphaltic repair, HMA pavement, wall modular block gravity R-66-0086, concrete box culvert B-66-146, concrete masonry endwalls, bar steel, curb ramps, manhole & inlet reconstruction/adjustments, MGS guardrail, erosion control, restoration, signing, traffic control, marking, traffic flashing beacons, sawing and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. 104-005 (20090901)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents