Last Updated 06/16/2021 11:13 AM
Project Title

Smith Creek Bike Lane Additions - Phase I and Phase II

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32310 (Leon, Wakulla Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phases I & II construction will add 5-foot paved bike lanes on both sides of the road and overlay/re-stripe approximately 2.3 miles of the roadway Includes shoulder pavement, asphalt milling /paving, new signage, guard rail replacement and all works called out on the construction The Phase I Smith Creek Bike Lane Additions begins at the intersection of Smith Creek Road (CR 375) and Blountstown Highway (State Road 20) and extends south approximately 1.3 miles. The project is located within sections 21 and 28 of Township 1S and Range 4W, in Leon County Florida. The Phase II Smith Creek Bike Lane Additions begins approximately 1.3 miles south of the intersection of Smith Creek Road (CR 375) and Blountstown Highway (State Road 20) and extends south approximately 1.0 miles. The project is located within sections 28, 29, and 32 of Township 1S and Range 4W, in Leon County Florida.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents