Last Updated 07/01/2020 07:44 AM
Project Title

Hodgson Road Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Nederland, TX 77627   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Hodgson Lift Station: Convert Submersible Pump Lift Station to Self-Priming Pump Lift Station as follows: 1. Removal of all existing submersible pumps, piping, guide rails, controls, hatches, conduits, and wiring. 2. Furnish and install two (2) new Self Priming Pumps, including all frames, motors, anchors, and connections to proposed piping. 3. Furnish and install new suction and discharge pipe, including all fittings, pipe supports, connections, gate valves, check valves, and painting. 4. Modify existing lift station structure by modifying top slab for grate supports and grating, abandonment of valve box, and installation of fill material and pump support slab. 5. Provide for cleaning and surface preparation of existing wet well interior coating including removal of accumulated solids and disposal. Install 2 coats of Coal Tar Epoxy coating over existing interior coating. 6. Provide for bypass pump connections, and maintenance of bypass pump operations during construction. Contractor will be allowed use of City Furnished BYPASS PUMPS. Contractor shall be responsible for relocation and reconnecting pumps, piping, and electrical for all proposed work. Contractor shall be responsible for maintaining flows at all times. 7. Contractor to provide temporary construction fence as required to secure the site. 8. Provide Site Improvements to replace existing chainlink fence and gates, final site grading, and seeding of all disturbed areas. 9. Furnish and Install all electrical improvements, including all control panels, conduits, wiring, connections to existing electrical service, proposed equipment, and SCADA. Viterbo Lift Station: 1. Remove and replace existing 24” culvert pipe with proposed 24” HDPE culvert. Provide connections to existing RCP storm sewer pipe. 2. Contractor to clean and provide epoxy injection inside valve box at pipe penetrations to seal groundwater.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents