Similar Projects
Serene Lake Elementary Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$20,000,000 CJ est. value
Edmonds, WA 98026

Explorer Middle School Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$30,000,000 CJ est. value
Everett, WA 98204

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

State Avenue Pavement Preservation NHS Project
Infrastructure
Bidding
$2,338,000 CJ est. value
Marysville, WA 98270

State Avenue Pavement Preservation NHS Project
Infrastructure
Bidding
$2,338,000 CJ est. value
Marysville, WA 98270

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

66th Ave West Pavement Reconstruction
Infrastructure
Post-Bid
$2,800,000 CJ est. value
Mountlake Terrace, WA 98043

Highway 99 Revitalization & Gateway Project - Stage 2 and 76Th Ave Overlay Project
Term Contract, Alteration
Results
Edmonds, WA

Highway 99 Gateway and Revitalization Project
Infrastructure, Alteration
Results
Edmonds, WA 98020

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

Last Updated 12/29/2023 11:34 AM
Project Title

179th Avenue Sidewalk Project

Physical Address View project details and contacts
City, State (County) Monroe, WA 98272   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $727,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Monroe (City) is requesting that interested and qualified firms submit a Statement of Qualifications (SOQ) to provide professional engineering and Right-of-Way (ROW) services for sidewalk improvements along 179th Avenue Property acquisition will need to be negotiated with two residential ownership interests, in addition to securing Temporary Construction Easements (TCE) for up to six residential parcels. The Consultant Agreement is expected to be awarded in January 2022 and will be for approximately 12 months in duration. The City reserves the right to supplement the contract to include construction management, inspection, material testing, or Project Management Review (PMR) assistance. If desired, the scope, fee, and contract time extension for these services will be negotiated at a later date.The project has received federal grant assistance for the design and construction phases. Local funds will be used for ROW services. Compliance with Federal requirements and adherence to the WSDOT LAG Manual must be observed for all phases of this project. The design and ROW phase have a 0% DBE goal. Notice of shortlistJanuary 3, 2022 Consultant interviewsJanuary 5th 7th AwardJanuary 25th 60% design to CityMarch / April 2022 90% design to CityMay 2022 Final Americans with Disabilities Act (ADA) Information The City of Monroe in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing Jammi Guion at PWContracts@monroewa.gov or by calling 360-863-4514. The method of Contractor Selection has not been Determined at this time. The Engineer's opinion of probable construction cost is approximately $727,000.00 Questions via phone will not be accepted. Questions received after January 22, 2024 at 5:00pm

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents