Similar Projects
Replace Dry Systems (Fire Sprinkler)
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Salem, VA 24153

Septage Pump and Haul Services
Term Contract
Sub-Bidding
Ashburn, VA 20147

Burlington #1158
Renovation
Post-Bid
Vienna, VA 22182

On-Call Plumbing/Sewer And Drain Services
Term Contract
Post-Bid
Lynchburg, VA

James River Visitor Center, VA, Plumbing & Well Protection
Results
$25,000 to $100,000 est. value
Monroe, VA 24574

4510--Replace Plumbing Fixtures in Buildings 7, 8, and 9 (VA-21-00079771)
Term Contract
Results
$100,000 to $250,000 est. value
Salem, VA 24153

Plumbing Maintenance and Repair Services
Term Contract
Sub-Bidding
Manassas, VA 20110

Advanced Metering Infrastructure Service and Repair
Term Contract
Post-Bid
Yorktown, VA 23690

Odor Control Pipe Insulation Install - WTP
Alteration
Results
Williamsburg, VA 23185

Turbo Wash Sink
Alteration
Post-Bid
Quantico, VA 22134

Airport Plumbing Leak Repair
Alteration
Results
Richmond, VA 23237

Backflow Preventer Services
Term Contract
Post-Bid
Abingdon, Dublin, Galax, Marion, VA 24210

Plumbing Services
Alteration
Results

VDSS Water Bottle Refill Stations
Alteration
Post-Bid
Richmond, VA

Commercial Plumbing Services
Term Contract
Results
VA

Last Updated 02/02/2023 03:57 PM
Project Title

Siege Lane Retention Basin

Physical Address View project details and contacts
City, State (County) Yorktown, VA 23692   (York County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $583,897 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

To convert an existing dry detention stormwater basin to a wet retention stormwater basin, with the excavation and disposal of approximately 13,988 cubic yards of soil materials, incidental clearing, grubbing, grading, storm drainage installations, solar powered pond aeration systems, erosion control, landscaping, fencing, and project site restoration. The Contractor shall furnish all materials, labor, tools, equipment, etc., to complete the project in accordance with the drawings and specifications. Additional work will consist of, but is not limited to, all labor, traffic control, materials, mobilization, testing, and incidentals necessary to construct the project. Questions Due: November 28, 2022 ZOOM BID OPENING INFORMATION: When: Dec 7, 2022 01:30 PM Eastern Time (US and Canada) Topic: BID OPENING: Siege Lane Retention Basin Please click the link below to join the webinar: https://us06web.zoom.us/j/82862479365 Or One tap mobile : US: +13017158592,,82862479365# or +13092053325,,82862479365# Or Telephone: Dial(for higher quality, dial a number based on your current location): US: +1 301 715 8592 or +1 309 205 3325 or +1 312 626 6799 or +1 646 931 3860 or +1 929 205 6099 or +1 564 217 2000 or +1 669 444 9171 or +1 669 900 6833 or +1 689 278 1000 or +1 719 359 4580 or +1 253 215 8782 or +1 346 248 7799 or +1 360 209 5623 or +1 386 347 5053 or +1 507 473 4847 Webinar ID: 828 6247 9365 International numbers available: https://us06web.zoom.us/u/kdJNBrjB0U

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents