Similar Projects
Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

CACO - Temporary Potable Water Storage
Results
Wellfleet, MA

Technology Park Low Service Tank Rehabilitation
Results
Less than $1,600,000 est. value
Falmouth, MA

Bournedale Tank Rehabilitation and Improvements Project
Results
Less than $300,000 est. value
Sagamore, MA 02562

Installation of a Hot Water Tank and Oil Burner at Stony Brook Elementary School
Post-Bid
Brewster, MA 02631

Installation of a Hot Water Tank and Oil Burner at Stony Brook Elementary School - Sub-Bid
Post-Bid
Brewster, MA 02631

Cleaning and Coating 2 MG Concrete Water Storage Tank
Results
Less than $100,000 est. value
Sandwich, MA

Power Washing of Two Water Storage Facilities
Results
Less than $14,000 est. value
Brewster, MA 02631

Pleasant Lake Elevated Water Storage Tank Improvements
Results
Less than $700,000 est. value
Harwich, MA 02645

Back Road Tank Replacement
New Construction
Results
$3,000,000 est. value
Mashpee, MA 02649

Sandy Pond Water Storage Tank Rehabilitation
Post-Bid
$350,000 est. value
West Yarmouth, MA

Sandy Pond Tank Rehabilitation
Post-Bid
Yarmouth, MA

Rotary Tank Rehabilitation
Post-Bid
Bourne, MA

Reported 07/29/2020 12:00 AM
Project Title

Greenway Road Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Mashpee, MA 02649   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $872,649
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract generally consists of abrasive blast cleaning and application of a new coating on all the interior and exterior surfaces of the Greenway Road Tank in Sandwich, Massachusetts. Also, miscellaneous structural and safety repairs are required during the rehabilitations. The water spheroid tank has a capacity of approximately 0.5 million gallons, stands approximately 197 feet high, and has a diameter of 55.5 feet.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents