Similar Projects
Underground Storage Tank and Well Installation
Infrastructure
Bidding
$3,000,000 CJ est. value
Edgartown, MA 02539

Annual Pavement Works
Infrastructure
Post-Bid
Aquinnah, Chilmark, Edgartown, Oak Bluffs, West Tisbury, MA

Tree Removal/Land Clearing for 55 West William Street
Infrastructure, Alteration
Post-Bid
Tisbury, Vineyard Haven, MA 02568

Airfield Pavement Project Marking and Rubber Removal
Results
$374,000 est. value
West Tisbury, MA

Streetscape Improvements Circuit Avenue
Infrastructure
Results
$1,100,000 est. value
Oak Bluffs, MA 02557

Paving Around New Chemical Storage Shed - GC
New Construction, Infrastructure - 13,600 SF
Construction
$75,000 CJ est. value
Oak Bluffs, MA 02557

Edgartown Bay Road Yoga Barn
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Edgartown, MA 02568

Edgartown Bay Road Yoga Barn
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Edgartown, MA 02568

Culvert Install and Road Work
Infrastructure
Post-Bid
$75,000 est. value
West Tisbury, MA

Tisbury School Addition and Renovation - Sub Bid
Addition, Demolition, Renovation, Infrastructure
Results
$22,384,557 CJ est. value
West Tisbury, MA 02568

Statewide Pavement Maintenance at General Aviation Airports in the Commonwealth Including Crack Sealing, Crack Repair, Pavement Repair
Infrastructure
Post-Bid
$3,500,000 est. value

Roadway Reconstruction and Related Work (Including Signals) On A Section of Boston Road (Route 3A)
Infrastructure
Results
$10,254,905 est. value

Paving Around New Chemical Storage Shed
Infrastructure
Post-Bid
$75,000 est. value
Oak Bluffs, MA

Pedestrian and Bicycle Improvements at Various Locations
Infrastructure
Results
$2,119,470 CJ est. value
Lenox, MA 01240

RFQ Construction Manager at Risk - Tisbury School Renovation and Addition Tisbury, Massachusetts
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$41,000,000 CJ est. value
West Tisbury, MA 02568

Last Updated 09/14/2022 04:32 AM
Project Title

Airport Pavement Markings

Physical Address View project details and contacts
City, State (County) West Tisbury, MA 02568   (Dukes County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

2022-MVY-XX The work includes: layout and painting of new pavement markings, and pressure washing existing markings. COMPLETION: The contract time for completion of all work is within 10 calendar days, from the date specified in the "Notice to Proceed". This project includes the remarking and rubber removal of Martha's Vineyard Airport, including Runway 6-24, Runway 15-33, and taxiways. It is expected that the Notice to Proceed will be issued in October 2022 and all work must be completed by November 15, 2022. LIQUIDATED DAMAGES: In the event that construction is not completed within the time specified in the plans, the OWNER may retain the sum of Two Thousand One Hundred Dollars ($2,100.00), unless otherwise specified in the contract documents, for each calendar day thereafter, Sundays and holidays included, that the work remains incomplete, not as a penalty, but as liquidation of a reasonable portion of damages that will be incurred by the Airport by failure of the Contractor to complete the work within the time specified. All Bid Proposals must be accompanied by a Proposal Surety (Bid Bond or other instrument as described in the Instructions to Bidders). Proposal Surety of the two (2) lowest responsible Bidders that have submitted bid proposals that comply with all the provisions required to render them formal will be retained until the Contract and Bonds have been signed by all parties. Proposal Surety of all other bidders will be returned or released as soon as it is practical. BIDDING PROCEDURES: The Bidding Procedures as outlined in the Instructions to Bidders. QUESTIONS AND CONTACT WITH THE OWNER: From the time of advertising until the actual bid opening for this Contract, all prospective Bidders, Contractors, Subcontractors, and Suppliers shall direct all inquiriesrelated to this projectsolely to: Amanda Sheridan, Project Engineer, McFarland Johnson, at asheridan@mjinc.com. The deadline for submitting inquiries related to this project is September 16, 2022 at 12:00 pm EDT. A successful Bidder entering into a contract for any portion of the work included in a proposal shall provide the Owner sufficient surety in the form of 100% Performance and Payment Bonds as outlined in the Supplemental General Provisions. The right is reserved to reject any or all proposals, to waive any formality and any and all technicalities in proposals and to accept such proposals as may be deemed in the best interest of the awarding agency

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents