Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Munson Road Improvements - Phase VII
Infrastructure
Design
$458,000 CJ est. value
Orono, ME 04473

Munson Road Improvements - Phase VII
Infrastructure
Design
$458,000 CJ est. value
Orono, ME 04473

Broadway Pedestrian Safety Improvements Project
Infrastructure
Bidding
$155,000 CJ est. value
Bangor, ME 04401

Broadway Pedestrian Safety Improvements Project
Infrastructure
Bidding
$155,000 CJ est. value
Bangor, ME 04401

Repair Remaining Traffic Signals and Controllers
Infrastructure
Sub-Bidding
$203,983 CJ est. value
Bangor, ME 04401

Cleanup of the Administration Building
Term Contract, Infrastructure
Sub-Bidding
$450,000 CJ est. value
Millinocket, ME 04462

Snow Removal/Sanding
Term Contract
Post-Bid
Hampden, ME

14 Seasonal Rest Areas - Maintenance, Cleaning and Light Carpentry
Post-Bid

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course with Drainage and Safety Improvements
Results
Less than $4,403,000 est. value
Medway, ME

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course, Bridge Work, with Safety Improvements
Results
Less than $7,703,000 est. value
Carmel, Etna, Newport, Palmyra, Plymouth, ME

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Nautilus Data Center / Millinocket
New Construction, Infrastructure
Pending Verification
$300,000,000 CJ est. value
Millinocket, ME 04462

Airport Improvement Program (AIP) Funded Runway Rehabilitation - City of Bangor
Infrastructure
Design
$3,000,000 CJ est. value
Bangor, ME 04401

Last Updated 08/05/2022 09:11 AM
Project Title

2022 Resurfacing of City Streets

Physical Address View project details and contacts
City, State (County) Brewer, ME 04412   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $444,674 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of Aug 5, 2022, project was awarded to Hopkins Paving awarded amount is $444,673.50 ** The project may include the grinding or full depth reclamation of existing road surface, furnishing and placement of hot bituminous concrete shims and overlays on existing City streets, parking areas and walkways. Total tonnage is estimated to be 3800 tons and total areas to be ground or reclaimed are estimated to be 31,450 square yards. The paving and/or grinding of said City streets shall not commence until such time as the Contractor receives a notice to proceed from the City Engineer or his designee. All paving must be completed by November 11, 2022. The City of Brewer, Maine holds the exclusive right to reject or accept all or part of any or all bids received.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents