Similar Projects
Last Updated | 10/03/2022 01:36 PM |
Project Title | Ionia Correctional Facility - HVAC Repair and Replacement |
Physical Address | View project details and contacts |
City, State (County) | Ionia, MI 48846 (Ionia County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2022 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $813,905 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of September 19, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Replacing condensing units and cooling coils in three buildings at Ionia Correctional Facility. ACCEPTING QUESTIONS UNTIL: September 8, 2022 at 5:00 pm local time. Please e-mail questions directly to Brent Huhn at Matrix Consulting Engineers, Inc. - bhuhn@matrixceinc.com Furnish all equipment, materials, labor, and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation, and disposal of the waste generated at the construction site for the Owner's review and approval. The Contractor will be required to produce waste management progress reports. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |