Similar Projects
Bike Lanes: Along the N. Villa AveNue., N. Youngs Boulevar., and N. Venice Blvd. alignments between NW 62nd St. and NW 10th St.
Infrastructure
Conception
$922,000 est. value
Oklahoma City, OK

Deep Fork Greenway Trail - Northeast Oklahoma City (Ward 7)
Infrastructure
Conception
Oklahoma City, OK

Demolition of Old Police Station
Demolition, Infrastructure
Design
$12,000 CJ est. value
Lawton, OK 73501

Utilities - US 64
Infrastructure
Design
Less than $300,000 est. value
Alva, OK

Kickapoo Street Sidewalk Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

A.C. Caplinger Sports Complex
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Edmond, OK 73034

Broken Arrow Event Center Rebid Packages
New Construction, Infrastructure
Sub-Bidding
$61,000,000 CJ est. value
Broken Arrow, OK 74012

Purchase and Remove House at 2222 W. 6th Ave
Demolition, Infrastructure
Sub-Bidding
$156,820 CJ est. value
Stillwater, OK 74074

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

Drainage Improvements at N County Line Road and NW 90th Street
Infrastructure
Results
$550,000 est. value
Oklahoma City, OK

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Pending Verification
$38,982,295 CJ est. value
Tulsa, OK 74108

West Reno, North Portland-Meridian - West bound on Reno Avenue from North Portland to North Meridian Avenue (Ward 3) - City of Oklahoma City
Infrastructure
Conception
$555,000 est. value
Oklahoma City, OK 73195

Last Updated 07/28/2022 04:11 PM
Project Title

Drainage Improvements Project Joe Street, Phases 1 and 2

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements include 7,316 cubic yards of un- classified excavation, 1784 square yards of 6 inch dowel jointed concrete pavement replacement, storm sewer manholes, junction boxes, concrete channels and storm sewer pipe as well as the relocation of 137 linear feet of 10 inch sanitary sewer and 108 linear feet of 8 inch water line. A cashiers check, a certified check or a security bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to unsuccessful bidders. All Work Completed: 135 calendar days

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents