Similar Projects
Floor Cleaning - Pope Army Air Field
Post-Bid
Fayetteville, NC 28308

Educational Resource Center VCT Replacement
Post-Bid
Fayetteville, NC 28301

NCMA Flooring Replacement - Fort Bragg
Results
Fort Bragg, NC

Margaret Willis Elementary School Media Center Replace Carpet with VCT
Post-Bid
Fayetteville, NC 28305

VCTY Replacement at Pauline Jones School
Post-Bid
Fayetteville, NC 28301

Floor Stripper and Finish
Post-Bid
Fayetteville, NC 28302

Fort Bragg Floor Repair
Post-Bid
Fort Bragg, NC 28310

Gray's Creek Elementary School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

Hope Mills Middle School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

William H. Owen Elementary School - VCT Replacement
Post-Bid
Fayetteville, NC 28304

Pine Forest Middle School - VCT Replacement
Post-Bid
Fayetteville, NC 28311

Margaret Willis Elementary (Admin Area) - VCT Replacement
Post-Bid
Fayetteville, NC

Remove and Replace Fayetteville FMS11 Facility Floors
Post-Bid
Less than $44,575 est. value
Fayetteville, NC 28306

Remove and Replace Facility Floors in Classroom - NCMA Fort Bragg
Post-Bid
Fort Bragg, NC 28310

Remove and Replace Flooring, Ceiling Tiles, and Paint Walls - Fayetteville Readiness Center
Post-Bid
Fayetteville, NC 28306

Reported 03/11/2021 01:29 PM
Project Title

56--Modular Raised Floor for Operation Center

Physical Address View project details and contacts
City, State (County) Fort Bragg, NC 28306   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The MICC End User requires the following items, Brand Name or Equal, to the following: LI 001: Modular raised floor for operation center. Metal framing and panels -Includes installation Access ramps and facia material included Tate Concore- HPL finish Tate 6” high bolted stringer understructure assembly 60 SF of ramp assemblies, 2 @ 5’W x 6L – to meet ADA compliance 44 SF of fascia closure plate To include Installation, 1, EA;

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents