Similar Projects
Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Colonial Manor Water Main Replacement Phase 3
Results
New Port Richey, FL 34655

Hilltop Drive Water Main Interconnect
Post-Bid
New Port Richey, FL 34654

Reclaimed Water Pipeline Extension – Phase 1
Post-Bid
$1,500,000 est. value
Zephyrhills, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Curley Street Water Main Relocation
Post-Bid
San Antonio, FL 33576

Madison Street Reclaimed Water Main Extension
Results
$595,000 est. value
New Port Richey, FL 34652

Starkey Boulevard Forcemain
Results
$3,300,000 est. value
FL 34637

As-Needed Miscellaneous Pipeline Construction
Results
New Port Richey, FL 34654

Comprehensive Wet Fire Sprinkler Systems / Fire Hydrant Services and Equipment
Term Contract
Post-Bid
New Port Richey, FL 34654

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

As Needed Pipeline Repairs Contract
Term Contract
Results
Less than $1,000,000 est. value
FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Inspection of Fire Hydrants
Term Contract
Post-Bid
FL

Last Updated 09/08/2020 08:19 AM
Project Title

Boyette Road Reclaimed Water Main Extension

Physical Address View project details and contacts
City, State (County) Wesley Chapel, FL 33545   (Pasco County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $651,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of the construction of 104 lineal feet of 8-inch PVC, 965 lineal feet of 12-inch PVC and 3705 lineal feet of HDPE reclaimed water main beginning at the Wesley Chapel District Park and continuing south along Boyette Road terminating at the intersection of Boyette Road and Merilee Place. The majority of the reclaimed water main will be installed by horizontal directional drilling. Conventional open trench excavation will be done at the project beginning and at connection points.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts