Similar Projects
Grading, Drainage, Paving, Retaining Walls, and Structures
Infrastructure
Bidding
$3,000,000 est. value
Lumberton, NC 28360

Grading, Drainage and Paving on Raleigh Road Parkway
Infrastructure
Bidding
$400,000 est. value
Wilson, NC 27893

Erosion Control - Grading Project
Infrastructure
Post-Bid
Cameron, NC 28326

Downtown Pedestrian Improvement Phase I Project
Infrastructure
Post-Bid
Waxhaw, NC

Drysdale Drive Extension
Results
NC

Historic Courthouse Drainage and Waterproofing
Results
Statesville, NC 28677

Carriage Park Entrance Culvert Rehabilitation
Construction
Hendersonville, NC 28791

Grading, Drainage, Paving, and Walls
Infrastructure
Bidding
$2,000,000 est. value
Clayton, NC 27520

Apex Warehouse - Drainage Rehabilitation
Infrastructure
Post-Bid
Apex, NC 27502

Stream Debris Removal: Stretches within the Lower Little River, Anderson Creek,and Upper Little River
Term Contract
Results
$1,638,347 est. value
Lillington, NC

Grading, Paving, Erosion Control on at the Intersection of NC 87
Infrastructure
Bidding
$3,000,000 est. value
Spring Lake, NC 28390

Culvert Replacement Project
Infrastructure
Post-Bid
Shelby, NC 28150

USDA Emergency Watershed Protection (EWP)
Results
Less than $251,160 est. value
Leland, NC

PT Crossings, Resurfacing, Grading, Drainage, C&G, Etc
Infrastructure
Bidding
$3,000,000 est. value
Lillington, NC

Sandy Creek Drive Culvert Replacement
Infrastructure
Post-Bid
$291,595 est. value
Wilson, NC 27893

Reported 07/18/2022 04:23 PM
Project Title

Bridlewood Drive Culvert Replacement - City Of Concord

Physical Address View project details and contacts
City, State (County) Concord, NC 28025   (Cabarrus County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2027
Bids Due View project details and contacts
Estimated Value $1,765,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This culvert replacement and upsizing under Bridlewood Drive is to reduce flooding risk to neighborhood homes and replace aging infrastructure. This project is identified in the Cold Water Creek Master Plan. As of July 16, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents