Similar Projects
New Library - City of Hartselle
New Construction, Infrastructure
Conception
$2,500,000 CJ est. value
Hartselle, AL 35640

New Fire Station 1 - City of Hartselle
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Hartselle, AL 35640

Polyplex USA Phase 1 & 2 Expansion
Addition, Demolition, Infrastructure
Design
$90,000,000 CJ est. value
Decatur, AL 35601

New Addition at Brewer High
Addition, Demolition, Infrastructure
Post-Bid
$90,000 CJ est. value
Somerville, AL 35670

Classroom Addition for Union Hill School
Addition, Demolition, Infrastructure
Post-Bid
$35,000 CJ est. value
Somerville, AL 35670

A New Parking Deck
New Construction, Infrastructure
Results
$9,888,519 CJ est. value
Decatur, AL 35601

Morgan County Parks & Recreation Concession & Restroom Building
Infrastructure
Results
$500,000 CJ est. value
Decatur, AL 35601

New Union Hill Elementary School - Morgan County Schools
New Construction, Infrastructure
Pending Verification
$12,500,000 CJ est. value
Somerville, AL 35670

Falkville Senior Citizens Center
Addition, Demolition, Renovation, Infrastructure - 4,800 SF
Pending Verification
$500,000 CJ est. value
Falkville, AL 35622

New Events Center - City of Hartselle
New Construction, Infrastructure
Conception
$3,500,000 CJ est. value
Hartselle, AL 35640

Founders Park Sound and Light Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Decatur, AL 35601

Micro-Milling, Resurfacing, and Traffic Stripe on SR-36
Infrastructure
Results
$1,497,404 CJ est. value
Hartselle, AL 35640

Beyond Gravity New Production Facility
New Construction, Infrastructure - 250,000 SF
Pending Verification
$134,000,000 CJ est. value
Trinity, AL 35673

River Port Warehouse Expansion
Addition, Demolition, Infrastructure - 40,000 SF
Post-Bid
$300,000 CJ est. value
Decatur, AL 35601

Hollon Meadow
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Decatur, AL 35603

Last Updated 07/18/2023 10:06 AM
Project Title

Construction of Lift Station No. 5 Rehabilitation

Physical Address View project details and contacts
City, State (County) Decatur, AL 35601   (Morgan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of providing Owner with improvements at a wastewater lift station including composite rehabilitation of concrete structures, replacement of piping, valves, pumps, new concrete structures, electrical components, conduit, wiring, and other appurtenances as necessary, and other miscellaneous facility and site improvements. Bids will be received for a single prime contract. Due to the specialized nature of the construction, the experience and qualifications of bidders will be evaluated by the OWNER and ENGINEER prior to the opening of Bids. Prequalification of Bidders is required. Each potential bidder shall submit, on the forms furnished within Document 00 45 13, a Bidder's Qualification Statement. Only those Bids submitted by Bidders determined by the OWNER and ENGINEER to be qualified will be considered. Bids received from Bidders who are not prequalified will not be opened. Bids shall be accompanied by a cashier's or certified check upon a national or state bank in an amount of five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within fifteen (15) days after notice of award of Contract to him. Such bid guarantee shall be made payable to Decatur Utilities. The successful bidder must furnish a performance, payment, and maintenance bond upon the form provided in the amount of one hundred percent (100%) of the contract price from an approved surety company holding a permit from the State of Alabama to act as surety, or other surety or sureties acceptable to the Owner. All bidders must provide certification of compliance with the E-Verify program per Alabama Act 2012-491. Bids must remain in effect for 90 days after the bid opening date. Within 90 days from the bid date, the Owner may award the contract to the lowest responsive, responsible bidder or reject any or all bids for the project. Decatur Utilities reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of the Decatur Utilities, and to reject nonconforming, nonresponsive, or conditional bids.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents