Similar Projects
Holden Elementary Building Upgrades
Renovation
Bidding
$700,000 CJ est. value
Holden, MO 64040

Plumbing Services - Major Projects (Rebid)
Term Contract
Sub-Bidding
Independence, MO 64050

Plumbing Projects
Renovation
Sub-Bidding
$200,000 CJ est. value
Saint Louis, MO 63103

Plumbing On-Call Services
Term Contract
Post-Bid
Crestwood, MO

Plumbing Services for the Philips Park Pavilion
Term Contract
Post-Bid
Columbia, MO 65201

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

At-Risk Construction Management Services
Term Contract
Post-Bid
Blue Springs, MO

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Testing, Adjusting And Balancing Proposal Package 7
Term Contract
Post-Bid
Saint Louis, MO

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

Kiel Garage Drain Repairs
Alteration
Post-Bid
Saint Louis, MO 63103

Last Updated 03/21/2023 02:07 PM
Project Title

2023 Street Rehabilitation - Phase 3

Physical Address View project details and contacts
City, State (County) Chillicothe, MO 64601   (Livingston County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,777,845 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The proposed work includes the following streets: 2nd Street: Work generally consists of the reconstruction of approximately 1,613 linear feet of 2nd Street including reconstruction of driveways and stormwater improvements. Estimated quantities consist of approximately 3,865 CY of excavation, 101 CY of embankment in place, 7,343 SY of aggregate base, 6,852 SY of 10-inch thick concrete pavement, 2,396 linear feet of concrete curb and gutter, 901 SY of concrete driveways, and installation of concrete sidewalk/ramps, including work zone traffic management, and erosion control. Maple Street: Work generally consists of the reconstruction of approximately 479 linear feet of Maple Street including reconstruction of driveways and stormwater improvements. Estimated quantities consist of approximately 881 CY of excavation, 173 CY of embankment in place, 2,225 SY of aggregate base, 2,047 SY of 10-inch thick concrete pavement, 938 linear feet of concrete curb and gutter, 131 SY of concrete driveways, stormwater system, and installation of concrete sidewalk/ramps, including work zone traffic management, and erosion control. Bidders with questions concerning this invitation may contact Michael Atkinson, P.E. at 7231 E. 24th Street, Joplin, MO 64804, 417-680-7200. Contract Time - 180 Calendar Days

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents