Similar Projects
Records Building
Renovation - 7,000 SF
Conception
Spanish Fork, UT 84660

Courts - City Of Orem
Renovation
Conception
$298,000 CJ est. value
Orem, UT 84058

RFP C/M - New Construction of the City of Saratoga Springs City Hall Building
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Saratoga Springs, UT 84045

Rocky Ridge Town Hall
New Construction, Infrastructure - 11,854 SF
Bidding
$1,400,000 CJ est. value
Rocky Ridge Town, UT 84645

Justice Court Renovation
Renovation
Post-Bid
West Valley City, UT 84119

RFP Construction Manager - Manti Sixth District Courthouse Administrative Office of the Courts
Demolition, New Construction, Infrastructure - 29,000 SF
Post-Bid
$13,107,870 CJ est. value
Manti, UT 84642

Construction Service of the West Jordan City Hall Remodel
Renovation - 74,000 SF
Results
$6,000,000 to $7,500,000 est. value
West Jordan, UT 84088

West Jordan City Hall Interior Remodel
Renovation
Results
$6,000,000 to $7,500,000 est. value
West Jordan, UT 84088

Utah State Capitol House Building Rules Renovations
Renovation
Construction
Salt Lake City, UT 84103

New City Hall - City of St. George
New Construction, Infrastructure
Conception
$29,296,600 CJ est. value
St George, UT 84770

General Contractor Services
New Construction
Post-Bid
Blanding, UT

Construction Management / General Contractor Services Orem City Center
New Construction
Results
Orem, UT 84057

Courts Building - City of American Fork
Renovation
Conception
$10,500,000 CJ est. value
American Fork, UT 84003

Morgan City Hall Basement
Renovation
Post-Bid
$462,300 est. value
Morgan, UT 84050

Richfield Courthouse Phase 2 Remodel With Lighting Upgrade
Build-out
Results
$428,163 CJ est. value
Richfield, UT 84701

Last Updated 03/20/2023 05:37 PM
Project Title

West Jordan Justice Center HVAC System Stage Two Replacement

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84088   (Salt Lake County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,261,583 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

West Jordan City is seeking bids from pre-qualified contractors to remove and replace the existing air handling unit. Provide with fan array, boiler system, air cooled DX system. See the construction documents for additional information. Also, rebalance the existing system. This is stage two of the process. The following Stage One Bidders are advanced and may submit their Stage Two low bids. Combustion and Control Service, Commercial Mechanical System and Service, Kemp & Hilton, KOH Mechanical Contractors Rocky Mountain Mechanical Questions arising subsequent to the issuance of this bid, that could have a significant impact on the responses to the bid, should be submitted in the bid Question and Answer section Event Number # WJPS23018201-Stage Two, at the online. All such questions should be received by February 17, 2023, at 10:00 a.m. MST. Answers to questions will be posted on the Utah Public Procurement Place which will then email the answer to all Vendors that downloaded the bid.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents