Similar Projects
Station 82 Bathroom Remodel - City of Longview
Renovation
Conception
$400,000 CJ est. value
Longview, WA 98632

Police Headquarters - Energy Efficiency Improvements - $FAC-00010 - City of Tacoma
Renovation
Conception
$2,500,000 CJ est. value
Tacoma, WA 98409

New Police Station - City of Lacey
Demolition, New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Lacey, WA 98503

Douglas County Fire District No.2 - Repair Water Damaged Manufactured Home
Renovation
Design
$200,000 CJ est. value
East Wenatchee, WA 98802

South Hill Sheriff Precinct Roof and HVAC Replacement
Renovation - 11,180 SF
Bidding
$1,100,000 CJ est. value
Puyallup, WA 98374

Primary Fire Station Continuing Operations Preservation Project
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Seatac, WA 98158

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Redmond Fire Station 16 and Maintenance Facility Seismic Upgrades
Renovation
Post-Bid
$2,000,000 to $3,000,000 est. value
Redmond, WA 98052

South King Fire and Rescue Facility Improvements Station 65 - Auburn
New Construction
Results
$1,190,000 est. value
Auburn, WA 98001

Douglas County Fire District No 2 Fire Station #3 - Rock Island
New Construction - 8,824 SF
Results
$3,400,000 est. value
Douglas, WA

Construction of Douglas County Fire District 4 Station 244 - Re-bid
New Construction, Infrastructure
Construction
$1,797,000 CJ est. value
Orondo, WA 98843

Lacey Fire District 3 Vehicle Repair Facility Expansion
Addition, Demolition, Infrastructure
Construction
$2,784,000 CJ est. value
Olympia, WA 98513

Harrison Range Improvements - $TPD-00001 - City of Tacoma
Build-out
Conception
$780,000 CJ est. value
Tacoma, WA 98422

New Fire Station - Beebe Fire Station
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Orondo, WA 98843

Small Public Works Projects
Renovation
Post-Bid
$350,000 est. value
WA

Last Updated 03/02/2023 09:07 AM
Project Title

Vancouver Public Safety Center / Police Headquarters Remodel

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98684   (Clark County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Project Delayed, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 2023, the project is resuming. The architect is working with the owner on a schedule for the project. The project requires funding. Information regarding the bidding and construction schedules is unavailable. Closed solicitation has been included below for reference. .............. The City of Vancouver is seeking SOQ's from qualified/licensed architectural firms to provide architecture/engineering (A/E) conceptual planning, development of design documents and other related professional services for the Vancouver Police Department Headquarters Building located at 521 Chkalov Drive in Vancouver Washington. Funding for this project will be provided with local funding provided by the City of Vancouver. The City of Vancouver in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises, as defined in 49 CFR part 26, will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin or sex in consideration for an award. The City of Vancouver is committed to providing equal opportunities to State of Washington certified Minority, Disadvantaged and Women's Business Enterprises in contracting activities. (Section 4 of Chapter 56, Laws of 1975, 1st Ex. Sess., State of Washington). *This project timeline has been extended due to the public health crisis. This project was originally scheduled to bid on 04/01/2020. Bid postponed to 04/08/2020 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents