MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

STEM and Agricultural Sciences Complex New Facility
New Construction, Infrastructure - 265,000 SF
Bidding
$36,000,000 CJ est. value
Auburn, AL 36830

Lee Road 296 Paving Improvements
Infrastructure
Post-Bid
Smiths Station, AL 36877

Lee Road 246/Mullin Road Improvements (Mill Creek)
Infrastructure
Post-Bid
Smiths Station, AL 36877

Northpark Drive Improvements
Infrastructure
Results
$1,563,629 est. value
Opelika, AL 36801

FY21 Community Development Block Grant Resurfacing Project
Infrastructure
Results
$279,389 est. value
Auburn, AL

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

RV Roadway of Opelika Service Building
New Construction, Infrastructure - 11,250 SF
Conception
$3,000,000 CJ est. value
Opelika, AL 36801

Last Updated 02/21/2023 11:03 PM
Project Title

Lake Wilmore Park Community Center

Physical Address View project details and contacts
City, State (County) Auburn, AL 36830   (Lee County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Clubhouse/Social Club, Fitness Center, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s), Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $19,514,073 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials and equipment necessary for the completion of the following project: Lake Wilmore Community Center The project will consist of the construction of a new 53,393 sf recreational facility in Lake Wilmore Park that includes an elevated walking track, multi-use courts, locker rooms, covered and heated swimming pool, fitness facilities, and multi-purpose rooms. An 1100' extension of Grove Hill Road, a 400' extension of Kentwood Drive, a 187 space parking lot, and a new sidewalk to Ogletree Road will be constructed as part of this project. The 14-acre site will also include clearing, earthwork, landscaping, and installation of new stormwater, water and sanitary sewer infrastructure. Guarantee will be required with each bid as follows: At least five percent (not to exceed $10,000) of the amount bid in the form of a certified or cashier's check or bid bond payable to the City of Auburn, Alabama. All bidders are required to be compliant with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, Act No. 2011-535 (Code of Alabama (1975) 31-13-9) as amended May 16, 2012 regarding employment practices. The successful bidder is responsible for acquiring the appropriate business licenses and permits to conduct work within the City of Auburn. Your attention in particular is invited to the section entitled "Instructions to Bidders", which is to be followed in all respects. The City reserves the right to select the lowest responsible bidder as the best interest of the City may require, to award the purchase contract from any of the bids, to reject any and all bids, and to waive any informalities in bids received. Bids will be good for thirty (30) days after being opened by the City of Auburn, Alabama. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to March 2023.

Details

53,393 SF. Parking Spaces, 187 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents