Similar Projects
Cornucopia - Port Wing Construction / Culvert Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashland, WI 54806

Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Timeless Timber Site Residential Redevelopment
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Ashland, WI 54806

Lock and Dam 4 Lower Guide Wall End Cell Project
Infrastructure
Bidding
$10,000,000 CJ est. value
Alma, WI 54610

New Water GBF North Plant Clarifier Rehabilitation Project
Renovation, Infrastructure
Bidding
$38,500,000 CJ est. value
Green Bay, WI 54302

Burnett County Public Safety Facility Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$32,600,000 CJ est. value
Siren, WI 54872

Dog Park Shade Structure
New Construction
Post-Bid
Bellevue, WI 54311

Pond and Drainage System Construction
Infrastructure
Results
$264,024 CJ est. value
De Pere, WI 54115

Alley Reconstruction
Infrastructure
Results
$663,465 CJ est. value
De Pere, WI 54115

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

Last Updated 05/24/2023 03:20 PM
Project Title

Toilet Shower Building and Vault Toilet Replacement - Council Grounds State Park (MEP)

Physical Address View project details and contacts
City, State (County) Merrill, WI 54452   (Lincoln County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $403,229 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

OWNER: State of Wisconsin, Department of Administration (DOA), Division of Facilities Development, hereinafter termed DFD. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of: The removal of a toilet/shower building, removal of a toilet building with 53 miscellaneous accessory structures, and the construction of a new toilet/shower building and the installation 54 of a prefrabricated pit toilet buildings at Council Grounds State Park near Merril Wisconsin. The 55 toilet/shower building has 1,715 square feet of enclosed areas and 289 square feet of covered area. Building construction has a poured concrete foundation and floor slab, masonry walls, wood roof trusses 2 with metal shingles. Interior finishes are painted CMU and porcelean tile floor finish with associated 3 plumbing, Ventilation and Electrical. Site preparation with demolition and new utilities and site 4 development is included. Base Bids will be received as a single lump sum bid for: 3) Plumbing; 4) Mechanical (Heating, 17 Ventilating, Air Conditioning); and 5) Electrical. 18 19 Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. 20 21 NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's 22 prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state 23 building projects no longer apply. These changes take effect for projects advertised for bid after 24 September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. A/E Contact: MSA Professional Services, Carter Arndt AIA, carndt@msa-ps.com, 608.355.8884 Bid Results PLUMBING WORK Hurckman Mechanical Industries, Inc - $235,900.00 MECHANICAL WORK Hurckman Mechanical Industries, Inc - $34,740.00 ELECTRICAL WORK Current Technologies, Inc - $132,589.00

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents