Similar Projects
Interquest Parkway Parking Lot
New Construction
Design
Colorado Springs, CO 80921

Cow Quiet Zones
Post-Bid
Westminster, CO 80031

Curb Repair for Holly Lot - Ahec-20402-D
Post-Bid
Denver, CO

SRTS Thunder Valley Trail
Results
Less than $1,093,992 est. value
Frederick, CO 80530

2019 Fish Pond Trail Extension
Results
Sterling, CO 80751

Polo Club Place Drainage and Roadway
Renovation
Construction
Denver, CO

Travel Centers Of America Addition
New Construction - 5,600 SF
Pending Verification
Commerce City, CO 80022

2019 Sidewalks Project
Post-Bid
Highlands Ranch, CO

2019 Concrete Replacement Program
Results
$135,000 to $165,000 est. value
Aurora, CO 80012

2020 Concrete Replacement
Post-Bid
Lone Tree, CO

2019 Citywide Concrete Spot Repairs, Phase 2
Results
Less than $495,082 est. value
Denver, CO 80202

Construction of the Safe Routes to School
Post-Bid
Gunnison, CO

Needham Elementary Connect Phase II
Results
Less than $1,000,000 est. value
Durango, CO

Providence Village Rec Center Landscape and Site Civil Improvements
New Construction
Post-Bid
Highlands Ranch, CO

South Federal Raised Medians project
Results
$1,000,000 to $5,000,000 est. value
CO

Reported 11/16/2019 12:00 AM
Project Title

Pkaa, Klondike Basin Project (644E)

Physical Address View project details and contacts
City, State (County) CO   (San Miguel County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Work Will Include Safeguarding 29 Adits Or Prospects And 5 Shafts. Closure Methods Will Include Backfill, Bulkhead, Grated Corrugated Steel Pipe, Cable Net And Bat Grate. Many Features Will Include Bat Compatible Grates Or Otherwise Require Exclusions Prior To Backfill Or Bulkhead. The Uranium Mine Closure Safety, Health And Environmental Action Plan Requirements Will Be Applied.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents