Similar Projects
Grand Avenue Viaduct West Of Chicago River - 41362 - City Of Chicago
Renovation
Conception
$6,500,000 est. value
Chicago, IL 60654

Bridge and Viaduct Painting #16 - 40901 - City of Chicago
Renovation
Conception
$1,500,000 est. value
Chicago, IL

RFQ - FAI 290 (Eisenhower Expwy) at Laramie Avenue, Phase II Engineering Project
Term Contract
Design
$15,099,000 CJ est. value
Chicago, IL 60624

RFQ - Various Phase II District Wide Pavement and Bridge Preservation Projects, Various Routes, Various Counties
Term Contract
Design
$35,000,000 CJ est. value
Schaumburg, IL 60194

Roadway and Bridge Reconstruction and Widening
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
South Holland, IL 60473

2022 Preventative Maintenance Project
New Construction, Infrastructure
Bidding
$600,000 est. value
Hoffman Estates, IL

Lincoln Yards - Dominick Bridge
New Construction
Post-Bid
$35,000,000 est. value
Chicago, IL 60601

Bridge Replacement at Hawthorne Hills
Post-Bid
Elgin, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Webster Avenue Bridge Over the North Branch of the Chicago River
Results
Chicago, IL

Elim Bridge Replacement
New Construction, Demolition
Construction
Crestwood, IL

Bridge and Viaduct Painting #15 - 40900 - City of Chicago
Renovation
Conception
$1,500,000 est. value
Chicago, IL

RFQ - FAI 94 (Edens Expwy) at Devon Avenue, Phase II Project
Term Contract
Design
$7,850,000 CJ est. value
Chicago, IL 60616

Construction Services for Repair of Steel Beam and Concrete for Bridge A0
New Construction, Infrastructure
Bidding
$700,000 est. value
Homewood, IL 60430

Skyway 75th Avenue Bearing Pedestal
Renovation
Post-Bid
Chicago, IL 60707

Last Updated 07/22/2022 05:36 AM
Project Title

RFQ - US 20 at IL 31, Phase III Project, Cook County

Physical Address View project details and contacts
City, State (County) Evergreen Park, IL 60805   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. C-91-195-18, US 20 at IL 31, Phase III Project, Cook County, Region One/District One . This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 4, 2022, at 12:00 PM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, the replacement of the existing bridge structure carrying IL 31 over US 20 and reconstruction of the interchange ramp intersections. The existing single span bridge will be replaced with a wider and longer two-span structure with the center pier located in the median of US 20 that will accommodate left turn lanes from IL 31 in each direction and increased lateral and vertical clearances on US 20. Right turn lanes will also be added from IL 31 to each entrance ramp. The project also includes interchange lighting, traffic signal modernization, provisions for pedestrian and bicyclist drainage system improvements. Maintenance of traffic will utilize staged construction and a detour for ramp reconstructions, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The following structures may be in this project: o S.N. 045-0017: Existing IL 31 bridge over US 20 o S.N. 045-2106: Proposed IL 31 bridge over US 20 The anticipated construction completion date is October 31, 2024, plus ten (10) working days. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 005 - RFQ - US 20 at IL 31, Phase III Project, Cook County

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents