Similar Projects
Lone Star Lodge & Marina Retail & Storage
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Pilot Point, TX 76258

Lakeshore Plaza Mixed-Use Development
New Construction - 51,815 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Little Elm, TX 75068

Lewisville Lake Project
Post-Bid
Lewisville, TX

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

Harvest Phase 7, 8A and 8B Mass Grading
Results
TX

Harvest Phase 9 Mass Grading
Results
TX

Charles Schwab Corporate Campus Phase II
New Construction - 617,000 SF
Construction
$10,000,000 CJ est. value
Westlake, TX 76092

Lakeside Center
New Construction - 138,000 SF
Construction
$10,000,000 CJ est. value
Flower Mound, TX 75077

Lakeside Crossing
New Construction - 31,183 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Lewisville, TX 75077

Walmart Supercenter #4627-278 - D8 Pet Cooler
Renovation - 188,180 SF
Design
Denton, TX 76201

Tannery Lake Dam Reconstruction
Post-Bid
Denton, TX

Harvest Phase 16A and 16B Mass Grading
Infrastructure
Results
TX

Advantage Storage
New Construction - 84,933 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Denton, TX 76210

Walmart Supercenter #3286-276 - D8 Pet Cooler
Renovation - 204,167 SF
Design
Hickory Creek, TX

Lakeside Mixed-Use Office Building
New Construction
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Flower Mound, TX

Last Updated 07/25/2022 04:02 PM
Project Title

Panther Creek Crossing LOT 8 / Ivybrook Academy (Shell Building)

Physical Address View project details and contacts
City, State (County) Frisco, TX 75034   (Denton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 25, 2022, final design is underway. Information regarding the general contractor or their method of selection has not been disclosed. Construction is scheduled to begin October 2022 and be completed May 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 6,403 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents