Similar Projects
Asphalt Maintenance and Sealcoating
Infrastructure
Post-Bid
$78,000 CJ est. value
New Lenox, IL 60451

Wilmington High School Building Trades Project - Excavating, Concrete Work, Labor and Material Bids
Infrastructure, Alteration
Post-Bid
$240,000 est. value
Wilmington, IL 60481

Single Span Reinforced Concrete
Alteration
Results
Joliet, IL

James Street Pump Station
Renovation, Infrastructure
Results
$1,260,597 CJ est. value
Plainfield, IL 60544

Construction Sidewalk and Concrete Improvements
Infrastructure, Alteration
Post-Bid
$300,000 est. value
Crest Hill, IL

Concrete Paving
Infrastructure, Alteration
Results
Plainfield, IL 60585

Prairie Avenue, Borio Drive & Essex Court Resurfacing
Infrastructure
Post-Bid
$700,000 CJ est. value
Crest Hill, IL 60403

Asphalt HTRD Entrance Road and Concrete Approach Slab
Infrastructure, Alteration
Results
Homer Glen, IL

Central Receiving Truck Dock Drainage Improvements
Infrastructure, Alteration
Results
University Park, IL

Post 15 Meter Vault Replacement
Demolition, Alteration
Results
$200,000 est. value
Tinley Park, IL 60487

Concrete Flatwork
Alteration
Results
$66,000 est. value
Crest Hill, IL

Systemwide Pavement Marking
Infrastructure
Results
$2,994,666 CJ est. value
Chicago, IL 60652

New Will County Morgue/Coroner Facility - Bid Package No. 2
Alteration
Results
$80,000 est. value
Joliet, IL 60433

Water Street Parking Lot
Infrastructure
Results
$204,095 CJ est. value
Wilmington, IL 60481

2022 Foundation Wall Repair
Renovation
Results
$216,900 CJ est. value
Wilmington, IL 60481

Last Updated 07/25/2023 02:36 AM
Project Title

2023 Curb and Sidewalk Program

Physical Address View project details and contacts
City, State (County) Plainfield, IL 60544   (Will County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PCC sidewalk and concrete curb and gutter replacements at various locations throughout the Village limits. The Contractor must be prequalified by the Illinois Department of Transportation for the type and amount of work to be performed unless approved prior to bidding by the Village of Plainfield. The successful bidder must comply with provisions of the Illinois statute entitled "Wages of Employees on Public Works", as amended. The successful bidder or bidders will be required to furnish a satisfactory payment bond and performance bond each in the amount of 100% of the contract. A certified check, bank draft, satisfactory bid bond, or cash, payable to the order of the Village of Plainfield in amount not less than five (5) percent of the bid shall be submitted with each bid. The Village of Plainfield reserves the right to reject the bid of any nonresponsive, non-responsible bidder, and waive any informality to the benefit of the Village of Plainfield. Any bidder may withdraw his bid prior to the opening of the bids. No bid shall be withdrawn after the opening of the bids without the consent of the Village of Plainfield for a period of sixty (60) days after the scheduled time of bid opening.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents