Last Updated | 08/13/2022 01:32 AM |
Project Title | Cocoanut/Central Street Improvements |
Physical Address | View project details and contacts |
City, State (County) | Sarasota, FL 34236 (Sarasota County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $361,826 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of August 12, 2022, the award amount is $361,826.13. The Work shall be constructed in accordance with the Contract Documents (plans, specifications and special conditions for CDBG solicitations & (Sub) contracts). A. Scope of Work: The work consists of installing a complete underground irrigation system as shown on the Drawings and as hereinafter specified, including the furnishing of all labor, equipment, materials and supervision in performing all operations in connection with construction of the irrigation system. B. General Description: 1. The irrigation system shall be constructed using the sprinkler heads, valves, piping, fittings, controllers, wiring, etc., of sizes and types as shown on the Drawings and as called for in these specifications. The system shall be constructed to grades and conform to areas and locations as shown on the Drawings. 2. Sprinkler lines shown on the Drawings are essentially diagrammatic. Locations of all sprinkler heads, valves, piping, wiring, etc., shall be established by the Contractor, in coordination with the landscaping, at the time of construction. Spacing of the sprinkler heads, valves, etc., are shown on the Drawings and shall be exceeded only with written permission of the Owner's authorized representative . 3. Unless otherwise specified or indicated on the Drawings, the construction of the sprinkler system shall include the furnishing, installing and testing of all mains, laterals, risers, fittings, sprinkler heads, gate valves, control valves, controllers, electric wire and all necessary accessories, the removal and/or restoration of existing improvements, excavation and backfill, and all other work in accordance with the plans and specifications as required for a complete system. Q & A deadline: Jul 06, 2022 5:00:00 PM EDT |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |