Similar Projects
Reported | 06/17/2020 12:00 AM |
Project Title | Renovation of Constitution Beach and Castle Island Playgrounds |
Physical Address | View project details and contacts |
City, State (County) | Boston, MA (Suffolk County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Services Master Contract to help design, permit and to prepare construction documents for two coastal playground renovation projects. The surfacing and new equipment for both projects will be laid out in AutoCAD by the playground manufacturer. The consultant will provide a site survey, permitting, and site design related to grading, drainage, layout, circulation, and restoration of the sites with connections to existing pathways. The project locations are: 1. Constitution Beach Playground, 799 Bennington St, Boston, MA 2. Castle Island Playground, 2010 William J Day Blvd, Boston, MA |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |