Similar Projects
SR-138 Park and Ride UTA/Transit
Infrastructure
Bidding
$500,000 to $1,500,000 est. value
Grantsville, UT 84029

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

2021 Faust Road/Cement Treated Base Project
Infrastructure
Post-Bid
Tooele, UT

Moenave Trail Improvements
Results

300 West Reconstruction from 900 South to 2100 South
Results

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

2021 Roadway Slurry Seal Project
Results
$157,450 est. value
Tooele, UT

IHC - Erda Roadway
Infrastructure
Post-Bid
Erda, UT 84074

S Roadway Improvements
Results

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

1000 West Reconstruction Project
Results
Tooele, UT 84074

Terra Residential Road Paving
Infrastructure
Post-Bid
$399,984 est. value
Tooele, UT

2021 Roadway Slurry Seal Project - Part 2
Infrastructure
Results
Tooele, UT

Construction of the 2022 Road- Way Reconstruction Project
Infrastructure
Post-Bid
Tooele, UT

High Density Mineral Bond Installed
Infrastructure
Results
Tooele, UT

Reported 05/27/2022 12:00 AM
Project Title

Pole Canyon and Center Street Realignment Project for Tooele County

Physical Address View project details and contacts
City, State (County) UT   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Construction Contract for the Pole Canyon and Center Street ReAlignment Project comprises the following general roadway improvement construction elements including but limited to: clear and grub new alignment; shape grade and compact sub-grade, pulverize existing asphalt for reuse as embankment material, construction of the Pole Canyon and Center Street new roadway re-alignment embankments using pulverized asphalt and untreated base course and imported Granular Borrow material based on the new alignments; new untreated base course and asphalt pavement; storm drainage swale construction; storm drainage piping and boxes, regrade and reshape shoulders; surface restoration/improvements, signage and striping, removal of existing fencing and install new wire fencing, adjust utilities boxes to finish grade and all other elements for a complete job. The project work is located on Pole Canyon Road east of State Route SR-36 to a new intersection of Pole Canyon Road and the new alignment of Center Street then north on Center Street to the connection of the new alignment of Center Street with current alignment of Center Street. Also, included is the traffic signalization on the easterly side ofSR-36 with the new Pole Canyon Road intersection all in Tooele County, Utah

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents