Similar Projects
S201--644 | Canteen Hood Cleaning Phoenix VA Health Care System
Term Contract
Design
Phoenix, AZ 85012

Two Water HVAC Upgrades Mechanical Contractors
Alteration
Bidding
Scottsdale, AZ 85256

Cooling Tower Water Treatment
Term Contract
Bidding
Peoria, AZ 85345

Chemical Water Treatment
Post-Bid
Luke Air Force Base, AZ 85309

Computer Room Air Conditioner (CRAC) Unit Preventive Maintenance
Post-Bid
Phoenix, AZ 85015

Boiler Inspection Services
Results
Phoenix, AZ

HVAC Replacement
Results
Phoenix, AZ

LDS Encanto Meeting House -- HVAC
Renovation
Construction
$450,000 est. value
Phoenix, AZ 85035

Compressor Replacement
Post-Bid
Phoenix, AZ

IHS1397567 Solicitation Preventive Maintenance and Repair for the Fume Hoods, PIMC
Results
Phoenix, AZ 85016

J041--Southern Arizona VA Healthcare System (SAVAHCS) Fisher House HVAC Control System Upgrade
Post-Bid
Tucson, AZ 85705

DEMA Annual HVAC Service, Repair, Maintenance
Results
Phoenix, AZ 85008

Provide AC Maintenance
Post-Bid
Coolidge, Oracle, San Carlos, AZ 85128

Air Compressor and Dryer Preventative Maintenance and Repair Services
Term Contract
Results
Tempe, AZ

Air Conditioner Unit Preventive Maintenance Services
Term Contract
Post-Bid
Hayden, Payson, Phoenix, Prescott, Yuma, AZ

Reported 02/18/2022 12:00 AM
Project Title

Rfq #12905B22q0030 Replace The Existing Alerton Controls Head End With A Single Jace-8 Web Server, The New Jace-8 Will Communicate Directly With The Existing BCMS, Maricopa, AZ

Physical Address View project details and contacts
City, State (County) Maricopa, AZ 85138 (Maricopa, Pinal Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing Alerton controls head end with a single Jace-8 web server, the new Jace-8 will communicate directly with the existing BCMs. All points currently mapped to the existing Alerton head end will be mapped to the new Jace-8, new graphics shall be created for the new Jace-8. Include a one (1) year service agreement. 1. Provide and Install a Jace-8 web server. 2. Provide 200 device licenses for Jace-8 web server 3. Integrate Jace-8 with existing Alerton BCM controllers. 4. Map existing head end points from all Alerton controllers to the new Jace-8 web server. 5. Create new graphics for all existing Alerton controllers mapped into the new Jace-8 web server. 6. Document all changes 7. Provide labor to set-up user accounts, trend logs, alarm and schedules. 8. Provide a minimum of 4 training hours. 9. Include 1 year service agreement. 10. Provide 1 year parts and labor warranty

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents