Similar Projects
Jet A Fueling Facility - apbd04 - City of Auburn
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Auburn, WA 98002

Delta Airport Communications Center Relocation - C801146 - Port of Seattle
Renovation
Conception
$2,438,000 CJ est. value
Seattle, WA 98164

Main Terminal Improvement / SEA Gateway Project - C801266 - Port of Seattle
Renovation
Design
$800,000 CJ est. value
Seattle, WA 98121

Sea-Tac Airport's C1 Building
Addition, Demolition, LEED Certification, New Construction, Renovation, Infrastructure - 110,000 SF
Design
$340,000,000 CJ est. value
Seatac, WA 98188

Nepl Improvements Phase II at Seattle-Tacoma International Airport and Port of Seattle Seaports
Infrastructure
Bidding
$4,000,000 CJ est. value
Seattle, WA 98158

Communications Enhancements - Seatac International Airport
Renovation
Bidding
$3,500,000 CJ est. value
Seattle, WA 98158

RFP D/B - North Main Terminal Redevelopment Project - Bid Package 8 - Subsystems 8.02, 8.03, 8.04 and 8.08
Renovation
Sub-Bidding
$35,000,000 CJ est. value
Seattle, WA 98158

Telecom Meet Me Room - Building
New Construction
Post-Bid
$4,400,000 est. value
Seatac, WA 98188

Seattle International Airport Main Terminal Low Voltage Upgrade - Bid Packages - 002
Renovation
Post-Bid
$30,000 CJ est. value
Seattle, WA 98158

Seattle-Tacoma Airport C Concourse Expansion (CCE) 4.1 Conveying Systems
Renovation - 8,000 SF
Results
$4,345,596 CJ est. value
Seattle, WA 98158

Checkpoint 1 Relocation at Seattle-Tacoma International Airport
Renovation
Results
$14,125,388 CJ est. value
Seatac, WA 98158

Concourse C Expansion - Port of Seattle
Renovation - 226,520 SF
Construction
$411,000,000 CJ est. value
Seattle, WA 98121

Concourse C Expansion - Port of Seattle
Renovation - 226,520 SF
Pending Verification
$411,000,000 CJ est. value
Seattle, WA 98121

Concourse A Addition - Sea Tac International Airport
Addition, Infrastructure - 47,000 SF
Pending Verification
$71,400,000 CJ est. value
Seatac, WA 98188

Airport North Entrance & Parking Lot Rehabilitation - City of Renton
Infrastructure, Renovation
Conception
$750,000 CJ est. value
Renton, WA 98057

Last Updated 07/07/2023 09:04 AM
Project Title

RFP Construction Manager - South Concourse Evolution Project

Physical Address View project details and contacts
City, State (County) Seattle, WA 98158   (King County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $900,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pursuant to RCW 39.10, the Port of Seattle (Port) invites the submittal of Proposals from firms, or teams of firms, interested in providing General Contractor/ Construction Manager (GC/CM) services for the South Concourse Evolution project at the Seattle-Tacoma International Airport. The Port is utilizing two contracts to achieve the GC/CM project delivery method. Questions related to this Solicitation are encouraged and can be submitted until February 15, 2023, no later than 4:00 p.m. Submit written questions to Vendor Connect. The first cont r a c t ( t h e P r e c o n s t r u c t i o n Services Agreement) covers the performance of Preconstruction services and is intended to culminate in the negotiation of, and agreement on, a maximum allowable construction cost (MACC) and schedule lbr the construction. of the Project, which would be covered by a second contract (the GC/ CM Contract.). T h e S o u t h S a t e l l i t e f a c i l it y, r e f e r r e d t o a s t he South Concourse, is an existing 3 story building (with seven levels from sub-basement to penthouse) located to the west of Concourse A at STIA, constructed in 1973 and expanded in 1984. Since then, it has received limited capital investment while sustaining heavy passenger use mainly from international travelers. With its aging building systems and cramped outdated facilities, this project is needed to extend the useful life of the building and enhance overall passenger experience. This project presents an opportunity to create a world class terminal facility that will cement. STIAs position as a west coast gateway of choice for international travelers. The goal of this project is to renovate the South Concourse facility to meet current building code requirements and create an. inviting destination for todays travelling public, with premium lounge space, greater selection of din.- ing and retail, and better spatial design. This project will upgrade existing structures and repurpose existing space to enhance the passenger experience. This proposed project will upgrade structural systems through the addition of new gatepods that will also provide lateral and seismic support for the existing building. In addition, the project will re-develop the vacated Federal Inspection Services (HS) and Customs and Border Protection (CBP) space s w i t h D u t y - F r e e s h o p p i n g and Airport Dining and Retail (A.DR) concessions, renovate the Concourse level for more efficient public circulation and expand the Penthouse level to provide needed club and premium lounge spaces to better accommodate todays unmet demand. The MACC determination with the GC/CM is targeted to be not later than Q2 2025. The estimated preconstruction services value is Eight Million. Dollars ($8,000,000.00) excluding sales tax. The estimated MACC is Nine Hundred Million Dollars ($900,000,000.00) excluding sales tax. This project will be funded with Federal Aviation Administration dollars. Applicable federal provisions will be included in the RFP. During the RFP phase, proposers must commit to the DBE goal as a matter of responsiveness. The DBE Goal is 2%. C o m m u n i c a t i o n w i t h t h e Port regarding this Solicitation shall be directed to the Central Procurement Office, Beth Sisk, at (206) 787-4760, or sisk.b(@- portseattle.org. The Port of Seattle, in accordance with the provisions of Title VI of th.e Civil Rights Act, of 1.964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Any person who believes they have been aggrieved by an unlawful discriminatory practice under Title VI has a right to file a formal complaint with the Port. Any such complaint must be in writing and filed with. the Ports Title VI Coordinator within one hundred, eighty (180) days following the date of the alleged dis criminatory occurrence. Title Vi Discrimination Complaint Forms may be obtained from the office of the Title VI. Coordinator at no cost to the complainant by calling (206) 787-4066 or sending an email to mailbox.t3@portseattle. org

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents