Similar Projects
Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

The Commons of Forsyth County Preschool
New Construction, Renovation
Design
Winston-Salem, NC 27101

Dallas Park Splash Pad
Renovation
Bidding
Gastonia, NC

Harper Park Playground
New Construction, Infrastructure - 15,000 SF
Bidding
$175,000 est. value
Knightdale, NC 27545

Pleasant Park GMP 4
Renovation
Sub-Bidding
Apex, NC

2020 Poured in Place Surface Replacement at Method Community Park Playground
Post-Bid
Raleigh, NC 27601

Spencer Love Phase 2 Court Expansion Project
Addition
Post-Bid
Greensboro, NC 27455

J.B. Flaherty Dog Park Upgrades
Results
Wake Forest, NC 27587

Playground Renovation at Fred G. Bond Metro Park
Results
Less than $400,000 est. value
Cary, NC 27513

Woodfield Landing
New Construction
Construction
$13,500,000 est. value
Havelock, NC

Pleasant Park
Construction
Less than $36,000,000 est. value
Apex, NC 27502

North Carolina Freedom Park
New Construction
Pending Verification
$3,000,000 est. value
Raleigh, NC 27601

Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Ashe County Industrial Park
New Construction
Bidding
$1,300,000 est. value
NC

Urinal Installation at Walnut Creek
Post-Bid
Raleigh, NC 27610

Reported 12/15/2021 12:00 AM
Project Title

Design-Build Conversion of Athletic Turf Fields

Physical Address View project details and contacts
City, State (County) Mooresville, NC 28115   (Iredell County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Design-Build.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at Mazeppa Park and will center around the conversion of existing grass fields to Shaw Legion HP 2.0 synthetic turf system. The scope includes professional stormwater design services along with construction, construction contracting and construction administration for the conversion of the 186,200 square feet area.

Details

Park/Playground, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents